Rahanisky, Whitechurch, Co.Cork
Proposed development
Permission to construct a two storey dwelling house, construct a detached garage, new vehicular entrance, proprietary treatment plant and all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
16 Jul 2026
Last day for public submissions (est.)
Wed 19 Aug 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission to construct a new dwelling house. The proposed development is located in the Monard Strategic Development Zone.
Permission for the construction of an extension to existing dwelling house
A 10-year permission and 40-year operation period for a Solar Farm and underground grid connection within an overall site area of 61.08 hectares. The solar farm consists of 330,200 square meters of solar photovoltaic panels on ground mounted steel frames; on-site electrical substation; electrical skids (containing inverters, transformers and switchgear); underground power and communication cables and ducts; boundary security fencing; new internal access tracks and associated drainage infrastructure; new site entrance to the L6965 local road; 10 no. CCTV/lighting posts and all associated site services and works. The development also includes underground grid connection, which is to be installed primarily within the L6965, L2951 and L2963 public roads, this includes the installation of 3 no. underground medium voltage electrical cables, 1 no. fibre communications cable, 2 no. joint bays and associated infrastructure to allow communications and connection between the proposed 38kV on-site substation and the Kilbarry 110kV Substation, Blackpool, Cork City. The total length of the cable is c.4,449m of which c.2,021m will be within the jurisdiction of Cork County Council and c.2,428m within the jurisdiction of Cork City Council. A concurrent planning application will be lodged with Cork City Council for the remainder of the underground cable along the public roads to allow connection to the Kilbarry 110kV Substation in Blackpool, Cork City under Section 34 of the Planning and Development Act 2000 (PDA)(as amended).
Permission Consequent on the grant of Outline Permission Reg.No. 22/4340 for the construction of a two-storey dwelling house with effluent treatment system and ancillary site works. The proposed development is located in the Monard Strategic Development Zone.
Construction of a two-storey dwelling, consequent to Outline Permission Reference 22/04340 with associated site works. The proposed development is located in the Monard Strategic Development Zone.
The construction of detached, two storey dwelling house with effluent treatment system and ancillary site works. The proposed development is located in the Monard Strategic Development Zone.