Castlemagner, Mallow, Co.Cork
Proposed development
Permission to retain the change of the site boundaries from those granted permission previously on 19/6103 and to retain the ground floor window fitted on the dwelling eastern elevation, and for permission to construct a domestic garage and lean to roof and all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 8 Sept 2026
Timeline
Application received
15 Jul 2026
Decision due
8 Sept 2026
Decision: grant with conditions
7 Sept 2026
Grant issued
13 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for development which consists of the construction of a new Wastewater Treatment Plant (WwTP) to replace the existing public and private WwTP’s currently servicing the agglomeration. The development will consist of the following: 1) Inlet works, including: 2 no. gravity inlets from the existing public WwTP & the private WwTP, full flow to treatment pumping station, inlets screen. 2) Primary treatment, including: 2 no. primary settlement tanks, 2 no. rotating biological contactors. 3) Secondary treatment, including; 2 no. Humus Tanks. 4) Discharge works, including; final effluent collection chamber, final discharge manhole, final effluent gravity pipeline and headwall along the Lisduggan North Stream. 5) Sludge treatment works, including; primary sludge pumping station, 1 no. sludge holding tank, 3 no. sludge drying reed beds, mixed liquor returns pumping station. 6) 1 no. stormwater storage tank and pumping station. 7) Construction of a new solar farm to provide a source of renewable energy to partly supply the WwTP. 8) 1 no. control and administration building. 9) Ancillary site works, including: upgrade of the existing entrance and access road from the L1042 roadway and construction of paved site roadways including associated parking. Installation of instrumentation, monitoring equipment and controls in accordance with Uisce Éireann’s technical standards. General groundworks, fencing, landscaping, ducting, pipework, manholes/chambers and drainage works including for filter drains, surface water pipeline and a swale. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Permission for development which consists of the construction of a new Wastewater Treatment Plant (WwTP) in the townland of Castlemagner Co. Cork to replace the existing public and private WwTP’s currently servicing the agglomeration. The development will consist of the following: Inlet works, including: • 2 no. gravity inlets from the existing public WwTP & the private WwTP. • Full flow to treatment pumping station; • Inlet screen. Primary treatment, including: • 2 no. primary settlement tanks; • 2 no. rotating biological contactors. Secondary treatment, including; • 2 no. Humus tanks. Discharge works, including: • Final effluent collection chamber; • Final discharge manhole; • Final effluent gravity pipeline and headwall along the Lisduggan North stream. Sludge treatment works, including: • Primary sludge pumping station; • 1 no. sludge holding tank; • 2 no. sludge drying reed beds; • Mixed liquor returns pumping station. 1 no. stormwater storage tank and pumping station. Construction of a new solar farm to provide a source of renewable energy to partly supply the WwTP. 1no. control and administration building. Ancillary site works, including: • Upgrade of the existing entrance and access road from the L1042 roadway and construction of paved site roadways. • Installation of instrumentation, monitoring equipment & controls in accordance with Uisce Éireann’s technical standards. • General groundworks, fencing, landscaping, ducting, pipework, manholes / chambers and drainage works including for filter drains, surface water pipelines & a swale. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Permission to construct a new dwelling house
To construct 1) a two-storey extension to the existing dressing rooms, incorporating a gym, toilet, club room and internal lift, 2) an astroturf pitch with perimeter fencing, 4 no. floodlighting masts and high level ball retention nets, 3) an uncovered viewing area consisting of concrete steps on the northern side of the existing playing pitch and 4) car parking area and all associated site works.
Permission for a (306 sq.m) community playground. Including playground equipment, 1.2m high wire mesh fence and gates, and all ancillary site works.
Permission for a (306 sq.m) community playground. Including playground equipment, 1.2m high wire mesh fence and gates, and all ancillary site works.