Loyola House, Knockaneroe, Castletownbere, Co. Cork
Proposed development
Permission for the following works to an existing residential terrace property – 1 Refurbish existing 2 storey rear extension to provide 1 no. two bedroomed residential accommodation unit – 2 Refurbish existing 1st floor to provide 1 n.o one bedroomed apartment – 3 Refurbish and change use of existing ground floor residential unit to commercial unit with adjoining accommodation corridor to serve 1st floor apartment and rear 2 bedroom 2 storey accommodation unit. Development will also include alterations to the existing street front ground floor elevation including a new side entrance to ground floor corridor and all associated siteworks
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 12 Aug 2026
Timeline
Application received
18 Jun 2026
Decision due
12 Aug 2026
Decision: grant with conditions
12 Aug 2026
Grant issued
16 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (housing or apartment development) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
Permission for the following works to existing dwelling: (i) change of use of part of ground floor of house for use as a coffee kiosk including installation of service hatch/window opening onto to public footpath and associated signage, (ii) construction of single storey extension with overhead terrace and access bridge to rear of dwelling, (iii) fenestration changes to dwelling including new window arrangement to front, installation of gable window, and installation of new windows and doors to rear, and (iv) all associated site works
Planning permission for existing and proposed works at the existing marine sourced feed & nutritional material processing and storage facility, as follows: Permission is sought for the retention and removal of 1) existing twin containers and 2) storage cabin, the retention of 3) the existing meeting room cabin, 4) maintenance cabin, 5) a maintenance container and of 6) a production lean-to extension. Permission is sought for 7) the demolition of the west loading dock and ramp. Permission is further sought for the construction of 8) a lean-to maintenance workshop, 9) enclosure to existing silos to north elevation, 10) raising of part of the production area roof by 3m, 11) northwest extension of production area, 12) sample store lean-to extension to west, 13) lean-to loading canopy to southwest, 14) additional loading dock to south, 15) enclosure to proposed tanker filling silos to existing alley, and 16) all associated site works.
Planning permission for existing and proposed works at the existing marine sourced feed & nutritional material processing and storage facility, as follows: Permission is sought for the retention and removal of 1) existing twin containers and 2) storage cabin, the retention of 3) the existing meeting room cabin, 4) maintenance cabin, 5) a maintenance container and of 6) a production lean-to extension. Permission is sought for 7) the demolition of the west loading dock and ramp. Permission is further sought for the construction of 8) a lean-to maintenance workshop, 9) enclosure to existing silos to north elevation, 10) raising of part of the production area roof by 3m, 11) northwest extension of production area, 12) sample store lean-to extension to west, 13) lean-to loading canopy to southwest, 14) additional loading dock to south, 15) enclosure to proposed tanker filling silos to existing alley, and 16) all associated site works.
The removal of an existing rock outcrop to form a stone hard standing area including associated site works. Rock romoved is to be temporarily stored within property of DAFM on Dinish Island prior to reuse within 18 months. The proposed site is situated towards the western end of Dinish Island within the property of Castletownbere Fishery Harbour Centre.
Permission for the refurbishment & extensions to existing derelict dwelling including:- (i) raising roof level by 1.10m (approx), (ii) construction of extension to rear, (iii) construction of extension to front in lieu of existing extension to be demolished, (iv) fenestration changes (v) and all associated site works
Permission for:- (i) demolition of existing commercial building, (ii) construction of new 2 storey dwelling house in lieu of same, and (iii) all associated site works