Coolfadda,, Bandon,, Co. Cork.
Proposed development
The construction of a residential development consisting of 72 no. residential units and all ancillary site development works. The proposed development provides for the construction of 48 no. dwelling houses comprising 16 no. 4 bedroom detached/semi-detached dwelling houses, 22 no. 3 bedroom semi-detached/townhouse units and 10 no. 2 bedroom townhouse units. The proposed development also provides for the construction of 6 no. 2-3 storey apartment/duplex buildings which accommodate 24 no. own door access apartment/duplex units (12 no. 1 bed and 12 no. 2 bed). The proposed development includes for the extension of the existing estate road network of Maple Drive and Maple View residential developments to the east of the site to facilitate access to southern areas of the proposed development while access to northern areas of the site will be provided via a vehicular site entrance from Convent Hill (L-2011). The proposed development also includes a separate pedestrian access from the Dunmanway Road (R586) to the south. Ancillary site development works include the provision of bicycle and bin storage facilities and the undergrounding/diversion of existing overhead lines.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
22 May 2026
Last day for public submissions (est.)
Thu 25 Jun 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The demolition of an existing shed/agricultural structure and the construction of a residential development of 83 no. dwelling houses, a single storey creche with associated bicycle racks and bin stores, open space, landscaping, public lighting and all ancillary site development works. The proposed development consists of the construction of 18 no. 4 bedroom semi-detached dwelling houses, 50 no. 3 bedroom semi-detached/townhouse dwelling houses, 6 no. 3 bedroom detached bungalow units and 11 no. 2 bedroom townhouses units. Vehicular access to the proposed development will be provided via a new entrance from Convent Hill (L-2011) to the north with a separate pedestrian access from the Dunmanway Road (R586) to the south. Extension of Duration to Permission granted under Planning Ref. No. 20/6697
The construction of a two-storey dwelling house and all ancillary siteworks including entrance and services. Extension of Duration to Permission granted under Planning Ref. No. 21/5486
Planning permission for the construction of a new single storey school building (238m2), soft play area (100 m2), the proposed relocation of the existing play-area, and all associated site works at Hamilton High School, Allen Square, Bandon, Co. Cork. The Development for which permission is sought is located within the curtilage of Protected Structures ( Ref. No. 955 & 962).
Permission for a) the demolition of an existing shed, b) the construction of eight townhouses fronting onto O'Mahony Avenue (total of eight 3-bedroom split level dwellings), c) the construction of two new vehicular entrances for a new one way vehicular access road, d) lay by parking, open area, new retaining walls to rear of site, boundary treatment and all associated site works.
Permission to (i) demolish detached toilet, (ii) construct a two-storey rear extension, (iii) install a rooflight on the front elevation and (iv) raise the height of the main roof, all to her dwelling.
a Large-Scale Residential Development (LRD) at Coolfadda & Kilbrogan (townlands), Bandon, Co. Cork. The proposed development consists of the construction of a residential development of 240 no. residential units comprising 156 no. dwelling houses, 84 no. apartments, a creche facility and all ancillary site development works. The proposed 156 no. dwelling houses comprise of 29 no. 4 bedroom detached/semi-detached dwellings, 126 no. 3 bedroom semi-detached/terraced units and 1 no. 2 bedroom detached dwelling house. The proposed 84 no. apartments will consist of 60 no. 2 bedroom units and 24 no. 1 bedroom units to be accommodated in 4 no. three storey apartment buildings. Vehicular and pedestrian access to the proposed development will be provided via new entrances from the L-2033 local road which will serve western areas of the proposed development and via Kilbrogan Street (L-2039) which will serve eastern and northern areas of the proposed development. The proposed development also provides for 2 no. shared vehicular entrances from Convent Hill to the south (L-2011) to serve southern areas of the proposed development. The proposed development also provides for public realm enhancements to Kilbrogan Street (L-2039), which include a raised table, and new footpath to connect to existing footpath infrastructure and provide connectivity to the Town Park. Other ancillary site development works include landscape and amenity areas, pedestrian and cycle paths within the site, bicycle parking and bin storage facilities, the removal/demolition of an existing pre-fab structure and a vehicular bridge crossing over an existing watercourse to serve as access for 26 no. of the proposed dwelling houses in northern areas of the site. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development.