Derryroe, Macroom, Co. Cork.
Proposed development
Permission to construct extension to western side of existing dwelling. Permission to remove roof of existing dwelling and to construct a new raised roof including repositioning of front and Gable windows and Permission to install a domestic wastewater treatment system and all associated site works.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
13 May 2026
Last day for public submissions (est.)
Tue 16 Jun 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for a Battery Energy Storage System (BESS) facility and Solar Farm. The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a. Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b. High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing and associated sightline improvement works, including the setback, lowering and trimming of existing boundaries and vegetation as required; and vi. all associated drainage and ancillary works necessary to facilitate the development. A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
The development will consist of the following elements: i. A Battery Energy Storage System (BESS) facility with a storage capacity of 130-150 MW, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array with an export capacity of 3 MW, comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission and a 40 year operational period is sought in respect of this planning application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
The development will consist of a Battery Energy Storage System (BESS) facility and Solar Farm comprising of the following elements: i. A Battery Energy Storage System (BESS) compound, consisting of battery containers with HVAC units, transformers, inverters, underground cabling, 2 No. associated control rooms, internal access routes, parking, lighting, CCTV, lightning masts, fencing. ii. A solar PV array comprising of ground-mounted panels on metal frames, together with associated inverters, transformer station, lighting, CCTV, fencing and internal electrical and communications cabling. iii. Operations and Electrical Compound consisting of: (a) Low voltage operations compound including three (3) operations containers (switchgear room, control & metering room and communications room), outdoor electrical plant, above ground and underground cabling, lighting, CCTV, diesel generator and diesel tank, welfare and office container, storage containers and waste storage areas, and adjoining; (b) High voltage electrical compound (TSO and IPP compound) comprising outdoor electrical plant, transformers, cabling, lighting, CCTV, lightning masts, fencing. iv. Underground high voltage electrical cable to facilitate a connection to the existing 110/220kV Clashavoon substation. v. New entrances and access roads (1 No. main access and 1 No. emergency access) to the site from the L-7473 local road including 1 no. stream crossing; and vi. all associated drainage and ancillary works necessary to facilitate the development A 10 year permission is sought in respect of the development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission to install a milk silo tank and all associated site works
1) Retention of cubicle house as constructed, 2) construction of cubicle house with underground slurry storage tanks and 3) construction of feed storage shed/machinery shed/cattle shed with under ground slurry storage tank and all associated site works.
Construction of new dwelling house, domestic garage and new entrance together with all other ancillary site works - Extension of Duration to Permission granted under Planning Ref. No. 17/6948