26/0765Awaiting decisionpermission

Gortnagross, Mallow, Co. Cork

Not open for objections: The 5-week submission period has ended.

Proposed development

A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.

Applicant
Not published
Authority
Cork County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    27 Mar 2026

  2. Last day for public submissions (est.)

    Thu 30 Apr 2026

  3. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The 5-week submission period has ended.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

26/0281Invalid

A 10-year permission for a solar farm consisting of solar photovoltaic panels on ground-mounted frames, one single-storey transformer station, internal access tracks, security fencing, CCTV, landscaping, and all associated site development works. The proposed development represents an extension to the solar farm permitted under Cork County Council Planning Permission References: 15/7003, 22/5174 and 21/4498. The solar panels and associated infrastructure are arranged within a total developable site area (including ancillary works) of 8.72 ha at Gortnagross, Mallow, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with sections 34D(b), the provision of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Gortnagross, Mallow, Co. Cork Cork County Council Received 9 Feb 2026
23/5686Granted

Planning permission to construct a new dwelling house.

Moanroe Ballyclough Mallow Co. Cork Cork County Council Received 18 Aug 2023
22/5174Granted

Modifications to the solar farm permitted under planning reg no. 15/7003 & extended under 21/4498 at Gortnagross, Mallow, Co.Cork. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station and associated layout changes. All modifications are within the boundary of the permitted development.

Gortnagross Mallow Co.Cork Cork County Council Received 23 May 2022
21/4819Granted

Permission to retain 1) garage for domestic use 2) wastewater treatment plant and trenches and 3) roadside boundary wall, and all associated site works.

Gortnagross Ballyclough Mallow Co. Cork Cork County Council Received 31 Mar 2021
21/4576Granted

To construct a new single storey domestic garage/home office and all associated site works

Moanroe Ballyclough Mallow Co. Cork Cork County Council Received 8 Mar 2021
21/4498Granted

A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 15.38 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV and all associated ancillary development works. - Extension of duration of permission granted under planning reference: 15/7003

Gortnagross Mallow Co. Cork Cork County Council Received 26 Feb 2021