Gubbeen, Schull, Co. Cork.
Proposed development
Erection of single storey extension to dwelling house and associated site development works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 4 Jun 2026
Timeline
Application received
5 Mar 2026
Decision due
4 Jun 2026
Decision: grant with conditions
21 May 2026
Grant issued
25 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for Retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-Farm Biogas Plant consisting of the following works: a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Construction of a new 12m Dia x 4.27m high overground steel slurry tank with an overall capacity of 482m3. (c) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (d) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (e) And all associated site works
Permission for retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-farm Biogas Plant consisting of the following works: (a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (c) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (d) All associated site works.
Retention planning for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the east of the existing farmyard complex and Planning Permission for an On-farm Biogas Plant consisting of the following works: (a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank complete with concrete roof. (b) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (c) Containerised prefabricated office/control cabin to the north of the proposed new biogas plant. (d) All Associated site works.
1.) Permission for a 126 sqm gross (102sqm net) single storey extension and link to main house, plus 74.1 sqm gross (60sqm net) conversion of garage and stores to their current dwelling incorporating bedrooms and living space 2.) permission for retention of a 40sqm studio outhouse now used as office and guest accommodation and 3.) permission for retention of a 44sqm attic
Permission for retention of fenestration changes and rear extensions to 2 no. dwelling houses and all associated site development works