Derrynanool, Mitchelstown, Co. Cork
Proposed development
Permission to install a 100% renewable energy ground mounted solar array consisting of 1390 no. solar PV panels (750kWp) and all associated site works.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
24 Feb 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(i) the installation of two ground-mounted solar photovoltaic arrays with a combined output of approximately 580kW, comprising Phase 1 of approximately 250kW (380 no. solar panels) and Phase 2 of approximately 330kW (500 no. solar panels), mounted on concrete ballast block foundations, together with wall-mounted inverters on an existing farm building, underground cable ducting alongside existing internal farm roads, fencing and all associated site works, for the purpose of generating renewable electricity for use within the existing agricultural holding, and (ii) the construction of a dry feed store (approximately 521m²) with 138 no. roof-mounted solar panels, for the storage of dry feed and agricultural inputs. The proposed development is for the purposes of an activity requiring an industrial emissions licence (EPA Reg. No. P0374-01). This development (renewable energy development and relevant solar energy development) is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
(i) the installation of two ground-mounted solar photovoltaic arrays with a combined output of approximately 500kW, comprising Phase 1 of approximately 200kW (320 no. solar panels) and Phase 2 of approximately 300kW (500 no. solar panels), mounted on concrete ballast block foundations, together with wall-mounted inverters on an existing farm building, underground cable ducting alongside existing internal farm roads, fencing and all associated site works, for the purpose of generating renewable electricity for use within the existing agricultural holding, and (ii) the construction of a dry feed store (approximately 521m²) with roof-mounted solar panels (approximately 138 no. panels), for the storage of dry feed and agricultural inputs. The proposed development is for the purposes of an activity requiring an industrial emissions licence (EPA Reg. No. P0374-01).
Permission to install a 100% renewable energy ground mounted solar array consisting of 1261 no. solar PV panels (750kWp) and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2024) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
Permission to install a 100% renewable energy ground mounted solar array consisting of 1261 no. Solar PV panels (750kWp) and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
Construct (i) a geomembrane covered manure storage lagoon, (ii) dry store with roof mounted solar panels for the storage of agricultural inputs and all associated site works. (The structures previously had the benefit of planning approval ref 07-4171 on the same footprint)
Construct a covered storage lagoon, dry store with roof mounted solar panels and all associated site works.