Island, Burnfort, Mallow, Co. Cork
Proposed development
Permission to construct a new dwelling house, detached domestic garage, domestic waste water treatment system and all associated site works.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 9 Apr 2026
Timeline
Application received
13 Feb 2026
Decision due
9 Apr 2026
Decision: refused
9 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
To infill low lying land with topsoil, subsoil, rock and construction & demolition waste to raise the level of the land for future agricultural use.
To infill lowlying land with topsoil, subsoil, rock and construction and demolition waste to raise the level of the land for future agricultural use.
Infilling low lying land with topsoil, subsoil, rock and construction and demolition waste to raise the level of the land for future agricultural use.
Permission to infill low lying land with topsoil, subsoil, rock and construction and demolition waste to raise the level of the land for future agricultural use.
To revise the location of site boundaries and the location of the percolation area as previously granted under planning Ref. No. 17/7438.
A two storey dwelling with detached garage, a septic tank treatment unit and percolation area with associated site works and a new site entrance.