Barnagore, Ovens, County Cork, P31 D253
Proposed development
The construction of a two-megawatt ballast-mounted photovoltaic panel array, associated electrical equipment and cabling on an area of grassland to the east of the main building on site. The array will have a maximum height of three metres above existing ground level, at the townland of Barnagore, Ovens, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
13 Feb 2026
Last day for public submissions (est.)
Thu 19 Mar 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Amendments and the extension to an existing service compound serving the Dell Technologies facility and all ancillary site development works. The proposed development consists of the demolition/clearance of 3 no. existing compound areas and associated equipment/structures to facilitate the construction of 2 no. single storey plantroom buildings and 2 no. new outdoor chiller compounds with associated electrical infrastructure/transformers and the installation of electrical infrastructure/transformers to serve an existing chiller compound. Ancillary site development works include the installation of an acoustic barrier/fence, the diversion of existing underground ESB lines, piperacks and landscaping proposals.
Permission to construct a gated vehicular entrance with associated boundary treatment and site works.
Planning permission to construct 2 No tennis courts with 2 No 14m Floodlights & 1 No paddle court with 2 No 6m Floodlights & associated site works including drainage, fencing, paths & electrical infrastructure.
We, MM Fiber Packaging Ireland Ltd., wish to apply for full planning permission for the following works at site located at MM Packaging, Barnagore, Ovens, Co. Cork, P31 CA55: 1) Construction of new storage unit to be located adjacent to existing package manufacturing facility and be used by same. New storage unit will be accessed via existing internal road network and site entrance currently serving the existing facility; 2) all associated site development works to include drainage works and the installation of new security fence and associated gates for the purpose of securely enclosing the site.
Permission for retention for alterations and extensions to dwelling including: the relocation of front entrance, the construction of a porch to the front of dwelling, removal of sunroom and construction of an extension to a lounge room at the rear of the dwelling and other general amendments to elevations.
Permission for two storey dwelling, sewerage system, site entrance and all associated works.