Baltydaniel West, Mallow, Co. Cork.
Proposed development
Permission to construct a dwelling and all associated site works and services.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 7 Apr 2026
Timeline
Application received
30 Dec 2025
Decision due
7 Apr 2026
Decision: grant with conditions
7 Apr 2026
Grant issued
12 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The construction of a new entrance to serve existing dwelling house, (2) retention of altered elevations to dwelling house to those permitted under planning ref: 03/1175, (3) the retention of Southern extension to dwelling house, (4) the demolition of Southern extension to dwelling house, (5) retention of existing garage as constructed and (6) all associated site works
Permission for retention of the following: (1) 2 No. Extensions to the rear of existing dwelling, (2) extension to the rear of existing domestic garage, (3) a domestic store room, (4) a domestic shed and all associated site works.
The demolition of a ground floor extension to north western side of the dwellinghouse, the construction of ground floor extensions to both side and rear of dwellinghouse, the alterations of existing front and rear elevations of existing dwellinghouse and removal of chimney
Dwellinghouse, detached domestic garage and waste water treatment system
The construction of new waste water treatment plant including (a) Control building, (b) over-ground glass lined steel SBR (Sequential Batch Reactor Wastewater Treatment process) tank, (c) overground precast concrete sludge holding tank, (d) underground balance tanks, (e) underground pump sump, (f) compound fencing and gates, (g) relocation of existing containerised kiosk (to be used for the storage of equipment and bunded containers of liquid additives for use in treatment process) (h) de-commissioning of existing wastewater treatment plant and (i) all ancillary works associated with the proposed development to serve their existing manufacturing plant
Underground wastewater pumping station, monitoring kiosk & ancillary site works to serve the proposed nearby mixed use retail and residential development (planning ref. no. 09/4078). The pumping station is designed to replace the existing pump station serving Kostal Ireland GmBH, extension of duration of permission granted under planning reg. no. 10/4125