Jaspil Lane, Kilbrogan, Bandon, Co.Cork
Proposed development
Permission for the retention of the construction of minor changes to the rear of houses 4 and 5 as permitted under planning reference 20/5431 involving a change in fenestration and a modest increase in the GFA of each dwelling by 15.72m2 and the retention of the construction of 2 no. garages and all associated works. Siteworks constructed and granted under planning reference 04/2631
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- Not available
Timeline
Application received
22 Dec 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for detached dwelling, new entrance and all associated site and ancillary works.
Permission to (i) demolish detached toilet, (ii) construct a two-storey rear extension, (iii) install a rooflight on the front elevation and (iv) raise the height of the main roof, all to her dwelling.
a Large-Scale Residential Development (LRD) at Coolfadda & Kilbrogan (townlands), Bandon, Co. Cork. The proposed development consists of the construction of a residential development of 240 no. residential units comprising 156 no. dwelling houses, 84 no. apartments, a creche facility and all ancillary site development works. The proposed 156 no. dwelling houses comprise of 29 no. 4 bedroom detached/semi-detached dwellings, 126 no. 3 bedroom semi-detached/terraced units and 1 no. 2 bedroom detached dwelling house. The proposed 84 no. apartments will consist of 60 no. 2 bedroom units and 24 no. 1 bedroom units to be accommodated in 4 no. three storey apartment buildings. Vehicular and pedestrian access to the proposed development will be provided via new entrances from the L-2033 local road which will serve western areas of the proposed development and via Kilbrogan Street (L-2039) which will serve eastern and northern areas of the proposed development. The proposed development also provides for 2 no. shared vehicular entrances from Convent Hill to the south (L-2011) to serve southern areas of the proposed development. The proposed development also provides for public realm enhancements to Kilbrogan Street (L-2039), which include a raised table, and new footpath to connect to existing footpath infrastructure and provide connectivity to the Town Park. Other ancillary site development works include landscape and amenity areas, pedestrian and cycle paths within the site, bicycle parking and bin storage facilities, the removal/demolition of an existing pre-fab structure and a vehicular bridge crossing over an existing watercourse to serve as access for 26 no. of the proposed dwelling houses in northern areas of the site. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development.
Permission for a residential development and all associated site development works at Macroom Road and Cork Road, Knockbrogan, Bandon, Co. Cork. The proposed development includes the construction of 34 no. residential units comprising of 14 no. dwellings (6 of which have an option of a 2 or 3 bedrooms) and 20 no. duplex units, car parking; bicycle parking and bin stores. The proposed site development works include: the undergrounding of a section of the 38kv overhead line currently traversing the site; new vehicle accesses from both the Macroom and Cork Roads; the provision of pedestrian crossings at the Macroom and Cork Road.
The installation of a free standing 13.04m x 4.2m x 4.1m (L x W x H) Containerised Biomass Boiler Unit, with all ancillary services and associated site works at the grass verge area adjacent St Brogan's College, Kilbrogan, Bandon, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission for the installation of a free standing 13.04m X 4.2m X 4.1m (LxWxH) Biomass boiler unit, with all ancillary services and associated site works