ObjectRight
Back to search
25/6728Grantedpermission

Fiddane, Charleville, Co. Cork, P56 NC84.

Not open for objections: The council has already decided this application.

Proposed development

Permission to (a) demolish a rear single storey extension, chimneys and rear dormer type window of the existing dwelling house, (b) demolish an existing rear single storey storage type building, (c) Permission to construct a two storey rear extension and a single storey link section and alterations to the existing dwelling house and (d) Permission to install a wastewater treatment plant and soil polishing filter and all associated site works.

Applicant
Not published
Authority
Cork County Council
Decision due
2 Jul 2026
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    9 Dec 2025

  2. Decision due

    2 Jul 2026

  3. Decision: grant with conditions

    30 Jun 2026

  4. Grant issued

    14 Aug 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

22/6536Granted

Permission to amend the design of the previously approved development (planning reference: Cork County Council 17/5799 & an Bord Pleanála ABP-306915-20)which comprises consent for a 67.8 hectare Solar PV farm at Fiddane, Ballyhea Charleville, Co.Cork. The proposed amendments include; (1) increase in number of transformers, (2) reduction in the spacing of Solar PV rows (strings), (3) increase in size and configuration of solar panels, (4) overall increase in solar power generation, (5) change in solar panels tilt (degree), (6) minor reduction in the height of solar array, (7) operational period proposed to be extended from 30 to 40 years. A Natura Impact Statement will be submitted to the planning authority with this application.

Fiddane Ballyhea Charleville Co.Cork Cork County Council Received 14 Nov 2022
20/5460Granted

Retention and completion of an extension to gable end of existing dwelling and permission for construction of a new vehicular entrance

Ardglass Charleville Co. Cork Cork County Council Received 13 Jul 2020
19/6965Awaiting decision

The development of a 67.8 hectare solar PV farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures 2.1m in height, together with 1 single storey ESB control room, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing, site entrance, hardstanding area, landscaping along part of the northern site boundary and other associated development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the planning authority with this application.

Fiddane Townland Ballyhea Charleville Co. Cork Cork County Council Received 13 Dec 2019
19/6816Awaiting decision

The development of a 67.8 hectare solar PV farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures 2.1m in height, together with 1 single storey ESB control room, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing, site entrance, hardstanding area, landscaping along part of the northern site boundary and other associated development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the planning authority with this application.

Fiddane Townland Ballyhea Charleville Co. Cork Cork County Council Received 25 Nov 2019
17/5799Granted

Development of a 67.8 hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 30 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures 2.1m in height, together with 1 single storey ESB control room, 14 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing, site entrance, hardstanding area, landscaping along part of the northern site boundary and other associated development works, for the purpose of generating renewable energy electricity.

Fiddane Ballyhea Co. Cork Co. Cork Cork County Council Received 13 Jul 2017
11/4151Granted

Construction of garage to rear of dwelling and retention of raising level of roof and conversion of attic to living accommodation with 3 no. velux rooflights to rear and 2 no. dormer windows to front of dwelling and septic tank and percolation area to rear

Ardglass Charleville Co Cork Cork County Council Received 31 Jan 2011