Ballinrea, Carrigaline, Co. Cork.
Proposed development
Permission for construction of an agricultural livestock shed with underground slatted slurry storage tanks and handling facilities and all associated siteworks.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 16 Mar 2026
Timeline
Application received
9 Dec 2025
Decision due
16 Mar 2026
Decision: grant with conditions
3 Mar 2026
Grant issued
14 Apr 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for a detached dwelling, new vehicular entrance, new potable well, new bio filtration treatment unit and all associated site works.
Modifications to the permitted solar farm (Pl. Ref. No.: 17/6784, ABP Ref. PL04.303013). The modifications are within the boundary of the permitted development and will consist of: i) Changes to the layout and dimensions of the permitted solar photovoltaic layout which will decrease the solar photovoltaic footprint from c. 159,100 sq.m of solar panels, to c. 145,000 sq.m of solar panels on ground mounted frames (this modification is to allow for the inclusion of a proposed 110kV substation and grid connection which will be subject to a separate application); ii) Amendments to the internal track layout and the removal of the permitted battery storage unit; iii) 6 no. single storey inverter/transformer stations (reduced from 10 no. permitted inverter/transformer stations). Permission is also sought for the provision of a 33kV internal network cable (c. 3,760m underground with c. 114m of overhead line) linking the Ballinrea solar farm with the Ballinvuskig solar farm (c. 1.74 km to the northwest). The proposed development includes all associated site works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and the NIS will be submitted to the Planning Authority with the application.
A solar farm consisting of circa 159,100 m2 of solar panels on ground mounted frames, 1 no. substation, 10 no. single storey inverter/transformer stations, battery storage module and associated equipment building, security fencing, satellite pole, CCTV and all associated ancillary development works. Construction and operational access to the site will be via the existing entrance from the L2464.
A solar farm consisting of circa 159,100 m2 of solar panels on ground mounted frames, 1 no. substation, 10 no. single storey inverter/transformer stations, battery storage module and associated equipment building, security fencing, satellite pole, CCTV and all associated ancillary development works. Construction and operational access to the site will be via the existing entrance from the L2464.
Retention of an existing 20 metre monopole with associated equipment and fencing, previously granted permission under Planning Reg. No. 04/1393, which forms part of an existing 3G broadband communications network
Continuance of use of a 20 metre monopole with associated equipment and fencing which forms part of a 3G communications network (previously granted under Planning Reg. No. 04/1393)