Mogeely Road, Grange, Castlemartyr, Co. Cork, P25 H9P3.
Proposed development
Permission for demolition of two sections of the existing single-storey warehouse buildings (Block 6 and Block 7) and the construction of a new single-storey extension linking Blocks 6 and 7 to provide additional floor area for production purposes, together with the construction of a new single-storey extension to the south-east side of Block 7 (total floor area approximately 694m2). The proposed development also includes the construction of a new generator room, the relocation of the existing dust extraction and biomass burner systems, the installation of solar photovoltaic (PV) panels on both existing and proposed roof structures, and all associated site development works and services.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 28 May 2026
Timeline
Application received
13 Nov 2025
Decision due
28 May 2026
Decision: grant with conditions
28 May 2026
Grant issued
7 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Planning permission for a residential development at lands off Main Street (townlands of Grange and Castlemartyr), Castlemartyr, Co. Cork. The development consists of the construction of a 42 no. unit residential development. The proposed two-storey development comprises 2 no. 2 bedroom townhouse units; 36 no. 3 bedroom units, provided in 4 no. townhouses and 32 no. semi-detached houses; 4 no. 4 bedroom semi-detached houses, landscaping, public open space, boundary treatments and all ancillary site development works. The development represents Phase 2 of a Masterplan for the proposed development on these lands. Access to the proposed development will be provided via a roundabout, estates road vehicular, pedestrian and cycle infrastructure provided for under Cork County Council Planning Ref. 25/6512. Ancillary infrastructure development works will include wastewater infrastructure, surface water drainage, water utility services, (all connecting with infrastructure provided for under Cork County Council Planning Ref. 25/6512), public lighting, bin stores, bicycle stores and all associated site development works.
O.R.M Unlimited Company seeks permission for the construction of a new ESB substation and switch room together with all associated site development works, services, and ancillary works at O.R.M, Mogeely Road, Castlemartyr, Co. Cork.
Permission for:- 1) Construction of a new pedestrian entrance, 2) Widening of the existing vehicular entrance, 3) Repurposing the existing car park area to include: 45 general parking spaces, 2 disabled parking spaces, 3 EV charging spaces and 1 coach parking space, provision of new car park public lighting, circulatory (one-way) roadway, footpaths, bicycle stands and all ancillary works.
Permission for conversion of ground floor apartment no. 1 & upper floor apartment no. 2 into a single end-terrace 3-storey townhouse dwelling.
Planning permission for a mixed-use residential and retail development at Main Street (P25 F682) and lands off Main Street (townlands of Grange and Castlemartyr), Castlemartyr, Co. Cork. The proposed development will consist of the demolition of 5 no. single-storey disused sheds and the construction of a 79 no. unit residential development, 8 no. later living units, two-storey creche, a retail unit (191.5m2), an anchor convenience retail store (1,900m2), the refurbishment of an existing commercial premises on Main Street for café use, including elevational and fenestration changes, signage and the demolition/replacement and enlargement of an existing single-storey extension to this unit, landscaping, and all ancillary site development works. The proposed residential component comprises 14 no. 2 bedroom townhouses, 55 no. 3 bedroom houses, provided in 14 no. townhouses and 38 no. semi-detached houses and 3 no. detached houses, and 10 no. 4 bedroom houses comprising 6 no. semi-detached and 4 no. detached houses, as well as the 8 no. 2 bedroom single-storey later living units. Pedestrian and cycle access to the proposed development will be via an upgraded existing entrance off Main Street to the south. The proposed development includes a new vehicular entrance to the subject lands from the N25 northern approach to Castlemartyr, including provision of new roundabout, new local vehicular access for residences to northeast of roundabout, zebra crossings, cycle and pedestrian path infrastructure, signage and associated landscaping. Ancillary infrastructure development works will include wastewater infrastructure including foul pumping station, surface water drainage, water utility services, public lighting, bin stores, bicycle stores, retail plant area, ESB substations and all associated site development works.
Permission to construct a single storey dwelling incorporating an existing shed, and all associated site works to the rear of 5 & 6 Main Street.