25/6057Grantedpermission

Coomatallin Windfarm (ROI) Limited, Coomatallin and Kippagh, Drinagh, Co. Cork

Not open for objections: The council has already decided this application.

Proposed development

The development will consist of: The extension of the operational duration of the existing Coomatallin Wind Farm and associated infrastructure (as permitted pursuant to Cork County Council Planning Register Reference 00/6380) for a further period of 20 years from the date of the expiry of its current operational duration. No changes are proposed to the number or dimensions of the existing permitted wind turbines. The existing wind farm comprises: (i) 4 no. wind turbines; (ii) associated turbine foundations and crane hardstandings; (iii) 2 no. site entrances, from the L8586 and L8299 public roads respectively; (iv) approximately 2.4 kilometres (km) of on-site access tracks; (v) a 20 kilovolt (kV) electrical substation and control building with a gross floor area of 74 square metres and associated electrical apparatus; (vi) underground electrical and communications cabling; and (vii) a meteorological mast with a total height of 60 metres (m). The development provides for the installation of an aviation warning light on turbine T4. This planning application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement which includes an assessment of the likely significant effects of the development; both individually and in combination with the relevant off-site or secondary developments which will occur as a direct result of the development, including the development' s existing grid connection infrastructure which comprises approximately 160m of 20kV underground electricity line and approximately 8km of 20kV overhead electricity line located within the townlands of Kippagh, Coomatallin, The Pike, Drinagh East, Lisbealad East, Lisbealad West, Kilronane West, Kilronane East, Milleenanannig, Nedinagh West and Ballyhalwick, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning And Development Regulations 2001 to 2025 shall apply. The planning application, Environmental Impact Assessment Report and Natura Impact Statement may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of - (a) 5 weeks or (b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.

Applicant
Not published
Authority
Cork County Council
Decision due
24 Nov 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    29 Sept 2025

  2. Decision due

    24 Nov 2025

  3. Decision: grant with conditions

    21 Nov 2025

  4. Grant issued

    6 Jan 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

15/675Granted

A single electricity generating wind turbine with a hub height of up to 65m and a rotor diameter of up to 55m, giving an overall tip height not exceeding 92.5m, with associated hardstand area, control building, access track and associated site works at Kippagh, Drinagh, Co. Cork. The planning application is accompanied by an Environmental Report (ER).

Kippagh Drinagh Co Cork Cork County Council Received 26 Nov 2015
12/436Granted

Construction of a two turbine extension to an existing four turbine wind farm at the townlands of Coomatallin, Kippagh and The Pike near Drinagh, Co. Cork. The maximum hub height will be 65m and the maximum rotor diameter will be 82.5m resulting in a maximum tip height of 106.25m. The associated works will include turbine foundations and hardstanding, transformers, access track, drainage and an extension to the existing substation

Townlands of Coomatallin, Kippagh and The Pike, Drinagh, Co. Cork Cork County Council Received 4 Jul 2012
07/1136Refused

Dwelling, domestic garage and associated site works

Coomatallin Drinagh Cork County Council Received 30 Apr 2007
06/960Granted

Windfarm consisting of 7no. wind turbines, meteorological mast (50m high), electrical sub-station, control building, upgrading entrance and ancillary works

Coomatalin Kippagh Drinagh Cork County Council Received 25 May 2006
00/6382Granted

Construction of a 50m high monitoring mast for wind measurement purposes

COOMATALLIN, COOMATALLIN, Cork County Council Received 24 Oct 2000
00/6380Granted

Windfarm consisting of 7 no. wind turbines,meteorological mast(50m high),electrical sub- station,control building,up- grading entrance & anc. works

COOMATALLIN, COOMATALLIN, Cork County Council Received 24 Oct 2000