Shrone, Glengarriff, Co. Cork
Proposed development
Construction of dwelling house and for all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 27 May 2026
Timeline
Application received
26 Sept 2025
Decision due
27 May 2026
Decision: refused
27 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for alterations to elevations of ancillary granny flat previously permitted under Planning Reference 25/00378
The development will consist of the installation of electronic communications comprising a 6-metre-high wooden pole supporting 1 No. radio-link dish, together with equipment cabinet, fibre chambers, pedestrian gate, foundation and all associated ancillary development works. The development is required to carry the broadband data from the new high-speed fibre broadband network on the Island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high-speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed.
Permission within the curtilage of a Protected Structure (RPS674) of the following: 4 no. mobile food/craft stalls with screens to be located on open air sitting area and plaza previously permitted under Planning ref 24/00351
Retention Permission to retain (A) Material alterations to the existing dwelling (B) Retention of the removal of an existing conservatory and balcony and (C) Permission to construct a balcony at first floor level and all associated site works at Firlands, Shrone, Glengarriff, Co. Cork.
The development will consist of the installation of electronic communications comprising an 8-metre-high wooden pole supporting 1no. radio-link dish, together with equipment cabinet, fibre chambers, pedestrian gate, foundation and all associated ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed.
Retention permission to retain (A) Material alterations to the existing dwelling, (B) Retention of the removal of an existing conservatory and balcony at first floor level and permission to construct a balcony at first floor level and all associated site works