Knocknagappagh, Killeagh, Co.Cork
Proposed development
Permission for retention of 1) slatted shed with concrete yard, 2) storage shed and walled concrete pit and all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 10 Nov 2025
Timeline
Application received
16 Sept 2025
Decision due
10 Nov 2025
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
We, Perigus Energy Ireland Midco Ltd., intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210ha of solar panels fixed on ground-mounted frames or precast concrete solar panel footings, gabion basket, or ballasted solutions. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning application for the on-site 220kV AIS Substation and loop in Grid
Permission for retention of the following: (i) slatted shed with concrete yard, (ii) storage shed and walled concrete pit, (iii) along with all associated site works at Knocknagappagh, Killeagh, Co. Cork, P36 AX63.
The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. We, Orsted Onshore Ireland Midco Ltd, intend to apply for permission for development at this site: Knocknagappagh, Barnaviddane, Ballyneague, Ballydaniel, Youghalpark, Ballydaheen and Cornaveigh in County Cork. The development will consist of: • A 323.28 ha solar farm with ca. 210 ha of solar panels fixed on ground-mounted frames. • The provision of 54 no. Inverter/transformer stations placed on concrete pads on hardcore sized 120m2. • Site access tracks formed from the provision of 5,135m of new site access tracks and the upgrade of 7,115m of existing access tracks/roads to facilitate access to all onsite infrastructure. • The provision of 1 no. new permanent site entrance for construction and operational access, with the addition of a temporary overrun area from the R634 regional road in the townland of Ballydaniel (site entrance 1). • The permanent realignment of 1 no. existing field access for construction and operational access from the L7806 local road in the townland of Knocknagappagh (site entrance 2). • The provision of 1 no. new permanent site entrance for construction and operational access from the L3803 local road in the townland of Barnaviddane (site entrance 3). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L3808 local road in the townland of Youghalpark (site entrance 4). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38081 local road in the townland of Cornaveigh (site entrance 5). • The permanent realignment of 2 no. existing field entrances for construction and operational access from the L7828 local road in the townland of Ballyneague (site entrance 6 and 7). • The permanent realignment of 3 no. existing field access for construction and operational access from the L7829 local road in the townland of Ballydaniel (site entrance 8, 9 and 10). • The permanent realignment of 1 no. existing entrance for construction and operational access from the L38032 local road in the townland of Knocknagappagh (site entrance 11). • Underground electrical ducting and cabling, including 3 no. road crossings (local roads L7829, L3803 and L78281) and 3 no. culvert crossings on the L3808. • The provision of 5 no. Temporary construction compounds of which there will be 1 main temporary construction compound (Compound No. 1 located in Ballyneague) ca. 5,200m2 with associated temporary offices, staff facilities parking and security fencing, and 4 no. additional temporary laydown areas of ca. 2,000m2 each located in the townlands of Ballydaniel, Barnaviddane, Cornaveigh and Youghalpark. • Landscaping works encompassing the removal of 395m hedgerow, the planting of 1,400m of new hedgerow and up to 31,000m of linear hedgerow and mosaic hedgerow as required all included in a Landscape Mitigation Plan. • The provision of Biodiversity Enhancement Areas. • The provision of 1 no. temporary spoil storage area. • The construction of a ca. 7,800m2 Battery Energy Storage System (BESS) compound including 56 no. Battery Container Units, 7 no. Inverter Twin Skid Units each consisting of 2 no. Inverters and 1 no. Transformer housed in Modular Enclosures, Communications Building housing switchgear and controls, House Transformer, Back-up Generator and Fuel Supply located in a Bunded Reinforced Concrete Plinth Area, Control Building, Internal Access Tracks, Security Fencing, CCTV, Lighting, Drainage any all other ancillary infrastructure. • All ancillary development such as drainage infrastructure (clean water cut off drains), security fencing, CCTV, weather stations and storage containers for spare parts. The application is requesting a 10-year planning permission for the development of a solar farm with an operational life of 40 years. A separate planning applicatio
Permission for Retention of (i) Slatted shed with concrete yard (ii) Storage shed and walled concrete pit all associated site works.
Permission for retention of first floor living space, roof lights, extension to kitchen and elevational changes to existing dwelling and associated works
Refurbish and make alterations to existing derelict dwelling; the construction of a part single-storey, part two-storey extension to the north (rear) of the existing derelict dwelling house, domestic garage, new walls and gates at existing site entrance, wastewater treatment system, an all associated ancillary works.