Knockbrogan, Bandon, Co. Cork
Proposed development
Permission for 8 no. 3-bedroom semi-detached dwelling houses and all ancillary site works. The proposed development is a change of house type from that permitted under An Bord Pleanala 320810-24 and Cork County Council Planning Reference 24/5216. Access to the proposed development will be provided via the Blossomhill primary estate road as previously permitted.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 3 Nov 2025
Timeline
Application received
9 Sept 2025
Decision due
3 Nov 2025
Decision: grant with conditions
3 Nov 2025
Grant issued
30 Dec 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for detached dwelling, new entrance and all associated site and ancillary works.
Permission to (i) demolish detached toilet, (ii) construct a two-storey rear extension, (iii) install a rooflight on the front elevation and (iv) raise the height of the main roof, all to her dwelling.
Permission for a residential development and all associated site development works at Macroom Road and Cork Road, Knockbrogan, Bandon, Co. Cork. The proposed development includes the construction of 34 no. residential units comprising of 14 no. dwellings (6 of which have an option of a 2 or 3 bedrooms) and 20 no. duplex units, car parking; bicycle parking and bin stores. The proposed site development works include: the undergrounding of a section of the 38kv overhead line currently traversing the site; new vehicle accesses from both the Macroom and Cork Roads; the provision of pedestrian crossings at the Macroom and Cork Road.
We Bank of Ireland Bandon (Cork County Council' s Record of protected structure reference number 20844177) wish to seek permission for the demolition of part of the existing boundary wall & pier and install a new rendered block wall with PCC capping and associated site works
Permission to construct a single-storey side extension to her dwelling.
The installation of a free standing 13.04m x 4.2m x 4.1m (L x W x H) Containerised Biomass Boiler Unit, with all ancillary services and associated site works at the grass verge area adjacent St Brogan's College, Kilbrogan, Bandon, Co. Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.