MSD Brinny Innishannon Co. Cork
Proposed development
Permission for a) Single storey extension with external mechanical plant platform (above roof of extension) to building 22, b) Elevational modifications to building 22, c) Associated site development works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 9 Oct 2025
Timeline
Application received
15 Aug 2025
Decision due
9 Oct 2025
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for the construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, and other construction materials and tools required soley in connection with the applicant's civil engineering and utility contracting business, a revised vehicular entrance and gate, internal circulation areas, parking and operational hard standing, 10m x 7m external storage area, storing Clause 804 and pipe grit for emergency use, associated surface water drainage infrastructure, waste water treatment system to serve wc and all other ancillary site development works.
Permission for the construction of 3690msq purpose-built operational infrastructure, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, aggregates and other construction materials and tools required solely in connection with the applicant' s civil engineering and utility contracting business, a revised vehicular entrance, internal circulation areas, service yards and operational hard standing, associated surface water drainage infrastructure and all other ancillary site development works
Permission to construct 20 no. electric vehicle charging bays within an existing private car park, including the installation of associated charging infrastructure, a single-storey electrical kiosk, relocation of one existing light standard, and all associated ancillary site works. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive License issued by the Environmental Protection Agency (EPA).
Permission to: a) Demolish existing porch to the front (south-western) elevation of the existing dwelling house, b) Demolish existing storage building to the side (south-eastern) elevation of the existing dwelling, c) Alter the front (south-western) elevation of the existing dwelling house including removing door and replacing this with a window of similar size and also extending the size of an existing window which will be changed to include a new door, d) Construction of two new dormer windows on the front (south-western) elevation of the existing dwelling house, e) Construction of a new pitched roof over the existing rear single storey area (north-eastern) of the existing dwelling house including raising the ridge height of this area, f) Construction of a new extension to the side (south-eastern) elevation of the existing dwelling house, g) Construction of a new vehicular entrance.
Permission for (A) Single storey extension to existing laboratory building (Building 22) with external mechanical plant platform (above roof of extension). (B) Elevational modifications to building 22 and associated site works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).
Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant, ancillary buildings (site office 63 sq.m), 3 no. welfare portacabins (32 sq.m, 23.5s q.m & 22.0 sq.m), 4 no. storage buildings/containers (15 sq.m, 10 sq.m, 6 sq.m & 5 sq.m), 2 no. garages (76 sq.m & 76 sq.m), ESB Substation (26 sq.m), covered vehicle storage (220 sq.m), site access and all related ancillary facilities (wheelwash, fuel storage tank, weighbridge etc), permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising removal of existing disused fuel storage tanks, recycling of c.15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years final restoration, total of 10 years. All within an application area of c.21.4 hectares.