Ballynabointra Midleton Co.Cork
Proposed development
Permission for backfilling of an exhausted quarry void (quarry registration ref; QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca) 11hectare (ha). The development will consist of the back filling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance datum (mAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the environmental protection agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca. 140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. A planning permission of 20 years is being sought for the proposed development. The planning application, Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authoririty.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 15 May 2025
Timeline
Application received
21 Mar 2025
Decision due
15 May 2025
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (industrial or warehouse building) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
Permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca). 11.2 hectare (ha.). The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance Datum (mAOD) with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The development will also include junction improvement works at the L7648 / N25 junction, located ca. 120m north of the quarry entrance. The application relates to development which involves an activity requiring a waste licence from the EPA. A planning permission of 20 years is being sought for the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
A 20 Year permission for the backfilling of an exhausted quarry void (quarry registration ref: QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area circa (ca) 11 hectare (ha). The development will consist of the backfilling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordance Datum (MAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of ca. 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca. 140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheelwash, garage, car parking and welfare facilities. The application relates to development which involves an activity requiring a waste licence from the EPA. A planning permission of 20 years is being sought for the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the planning authority with the application.
A 20 Year Permission for backfilling of an exhausted quarry void (quarry registration ref; QR078) and acceptance, short-term storage and processing of construction and demolition (C&D) waste on-site, within an overall application area of circa (ca) 11hectare (ha). The development will consist of the back filling of the quarry void (ca. 4.9ha) to a level of ca. 27 metres above Ordnance datum (mAOD) with either; 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stones, and river dredge spoil which will result in the proposed development operating as a soil recovery facility that requires a waste management licence from the Environmental Protection Agency (EPA); or 2) Soil and Stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product as its source of origin and transported as a by-product material to enable the site to be backfilled. The proposed C&D processing facility will cover an area of c.a 1.9ha and will operate under a waste management licence from the EPA. The development will also comprise of the construction of an inspection shed (ca.140m2) and ancillary improvements to drainage and landscaping. The development will utilise existing infrastructure on-site including weighbridge, wheel wash, garage, car parking and welfare facilities. A planning permission of 20 years is being sought for the proposed development. The planning application, Environmental Impact Assessment Report (EIAR) and Natura impact Statement (NIS) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.
Permission for the construction and operation of a concrete batching plant which will produce up to 70,000m3 of ready-mix concrete annually. This will replace the existing concrete batching plant that was permitted under application reference S/98/4005, which will be dismantled and removed as part of the proposed development. The application area will cover 1.02 hectares and is located within the northern portion of Carrigtwohill Quarry. Carrigtwohill Quarry is an existing active quarry, located within the applicant’s landholding, and covers an area of 91.92 hectares. The proposed concrete batching plant will include concrete plants (x2), 120 tonne cement silos (x8), 50,000L water tanks (x2), storage bins (x10), control cabin/welfare facilities (port-a-loo type unit), conveyor system (x2), washout lagoons, an access ramp and associated drainage infrastructure including a settlement tank and an attenuation tank. Roadstone intends to utilise both virgin aggregates (from Carrigtwohill Quarry) and recycled aggregates from the existing waste facility. Permit on-site (reference WFP-CK-15-0154-02) in accordance with the National End of Waste Criteria for the Recycled aggregates. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Permission for the construction and operation of a concrete batching plant which will produce up to 70,000 m3 of ready mix concrete annually. This will replace the existing concrete batching plant that was permitted under planning reference 98/4005, which will be dismantled and removed as part of the proposed development. The application area will cover 1.02 hectares and is located within the northern portion of Carrigtwohill Quarry. Carrigtwohill Quarry is an existing active quarry located within the applicant’s landholding and covers an area of 91.92 hectares. The proposed concrete batching plant will include concrete plants (x2), 120 tonne cement silos (x8), 50,000L water tanks (x2), storage bins (x10), control cabin/welfare facilities (port-a-loo type unit), conveyor system (x2), washout lagoons, and access ramp and associated drainage infrastructure including a settlement tank and an attenuation tank. Roadstone intends to utilise both virign aggregates (from Carrigtwohill Quarry) and recycled aggregates from the existing waste facility permit on-site (reference WFP-CK-15-0154-02) in accordance with the National End of Waste Criteria for the recycled aggregates. The planning application is accompanied by a Natura Impact Statement (NIS).
The development will consist of the construction of a new storage shed and an external paved yard to facilitate the importation, storage and processing of road planings with an application site of c. 1.0 hectares. The development will comprise- Construction of an external yard comprising a reinforced concrete ground bearing slab (c.2032m2) to store and process imported road planings. Construction of a portal frame storage shed (c.2053m2) to store processed road planings. Installation of sub-surface drainage to collect surface water run-off which will discharge via a silt trap and hydrocarbon interceptor to the adjoining quarry floor (and to the ground thereafter).