Inchintaggart Glengarriff Co. Cork
Proposed development
Permission for the following works to existing dwelling house: (i) retention of replacement of pitched roof constructed 600mm higher than original roof, (ii) retention of fenestration changes (iii) retention of alterations to chimney, (iv) decommissioning of existing wastewater treatment system and replacement of same with new wastewater treatment system, and (v) for all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 18 Dec 2025
Timeline
Application received
5 Aug 2025
Decision due
18 Dec 2025
Decision: conditional permission
3 Dec 2025
Grant issued
16 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for alterations to elevations of ancillary granny flat previously permitted under Planning Reference 25/00378
The development will consist of the installation of electronic communications comprising a 6-metre-high wooden pole supporting 1 No. radio-link dish, together with equipment cabinet, fibre chambers, pedestrian gate, foundation and all associated ancillary development works. The development is required to carry the broadband data from the new high-speed fibre broadband network on the Island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high-speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed.
Retention Permission to retain (A) Material alterations to the existing dwelling (B) Retention of the removal of an existing conservatory and balcony and (C) Permission to construct a balcony at first floor level and all associated site works at Firlands, Shrone, Glengarriff, Co. Cork.
The development will consist of the installation of electronic communications comprising an 8-metre-high wooden pole supporting 1no. radio-link dish, together with equipment cabinet, fibre chambers, pedestrian gate, foundation and all associated ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed.
Retention permission to retain (A) Material alterations to the existing dwelling, (B) Retention of the removal of an existing conservatory and balcony at first floor level and permission to construct a balcony at first floor level and all associated site works
Permission for (1) retention of side extension to dwellinghouse (2) retention of rear extension to dwellinghouse (3) retention of construction of metal garden shed (4) retention of change of use of timber garden shed to a home office and gym, for use ancillary to the use of the dwellinghouse (5) retention of covered garden pergolas, and (6) retention of alterations to layout of vehicular entrance