Garryndruig Timoleague Bandon Co.Cork
Proposed development
Permission to construct a machinery storage shed for own farm machinery for own use, and carry out all associated site works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 27 Aug 2025
Timeline
Application received
11 Feb 2025
Decision due
27 Aug 2025
Decision: conditional permission
27 Aug 2025
Grant issued
3 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
A 10-year permission for the construction of a battery energy storage system (BESS) facility consisting of two single-storey BESS units, two single-storey power conversion system (PCS) units, a single storey transformer station, underground cabling connecting the BESS to the permitted substation within the solar PV farm( permitted under Planning Ref. No. 25/6532) security fencing and gate, acoustic barrier and all other ancillary site development Kilshinahan, Timoleague, Co. Cork. The BESS facility will be arranged within a site area of approximately 0.043ha co-located within the development boundary of the permitted solar PV development, Planning Ref. No. 25/6532. This development is covered by the provisions of the Renewable Energy Directive III (Directive(EU)2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development regulations 2001 to 2025 shall apply.
A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15sqm), 1 no. single storey delivery station (53sqm), 2 no. single storey spare parts storage containers (15sqm each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction and completion of the solar farm as permitted by and commenced under Planning Permission Ref. 15/6968, extended by Ref. 21/4496 and modified by Ref. 22/6452, with proposed minor changes to that which was permitted to the site layout, as shown in the permitted site layout drawings (Drawing Ref. No.s 4332_2005_A, 4332_2006_A and 4332_2007_A), including array arrangement and internal track route, and minor changes to the fence alignment along the north west boundary; and the addition of a second single storey spare parts storage container (15sqm) (2 no. single storey spare parts storage containers in total). It is anticipated that works under the extant planning permissions will commence with the approved site clearance works, access roads and temporary internal tracks/roads, fencing and gates, and the proposed development will incorporate those works and such further construction and completion of the solar farm as modified by the proposed grant of planning permission the subject of this application. A 2-year permission is sought, with works expected to commence in Q1 2026 under the extant permissions and this permission is sought to secure the completion of the solar farm development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Permission for the construction of an agricultural building for the housing of horses and associated site works
Permission to construct a machinery storage shed for own farm machinery for own use, and carry out all associated site works
A new vehicular entrance off the L6089 to access the permitted solar farm development (Pl.Reg.No. 15/6968, as extended by Pl.Reg. No. 21/4496 and modified by Pl.Reg.No. 22/6452) including all ancillary works.
Modification to the solar farm permitted under planning reg no. 15/6968 and extended under 21/4496. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station, change to permitted fencing type and associated layout changes. All modifications within the boundary of the permitted development.