27 Careystown Meadows Ballincarroonig Whitegate Co.Cork
Proposed development
Permission is sought for construction of a detached garage, single storey with flat roof and associated works
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 27 Mar 2025
Timeline
Application received
31 Jan 2025
Decision due
27 Mar 2025
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Outline permission for 4 no. semi detached, two-storey dwelling houses, complete with access road, bridge and paved courtyard, including site boundaries and all other site development and landscaping works on their lands at Mosestown td., Whitegate, Co. Cork. The submission for outline permission includes Natura Impact Statement (NIS) together with ecology survey and report - the Natura Impact Statement will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours, at the offices of the Planning Authority.
Outline Permission to construct 4 no. semidetached, two-storey dwelling houses, complete with access road, bridge and paved courtyard, including site boundaries and all other site development and landscaping works, on their lands at Mosestown Td, Whitegate, Co.Cork. The submission for outline permission includes a Natura Impact Statement together with Ecology Survey and Report.
Permission for demolition of existing derelict cottage and construction of new two storey dwelling with associated site development works.
Electricity Supply Board (ESB) intend to apply for Permission for development at this site of 4.65 hectares at Ballincarroonig, Aghada, County Cork, within the wider ESB landholding. The development will consist of the "Aghada LDES" (Aghada Long Duration Energy Storage) project comprising a Battery Energy Storage System (BESS) with a capacity of up to 300 MW. It comprises a fenced compound containing a BESS compound and Customer HV Compound. Specifically, the BESS compound will feature up to 200 No. 20 ft battery energy storage system (BESS) enclosures and up to 20 No. Medium Voltage (MV) Skids / Twin Inverter Skids and associated bunds. Associated ancillary equipment includes 1 no. MV switchgear building, 1 no. Control Building, 5 no. LV Switchgear Containers, a fire water tank and pumphouse, Operation and Maintenance site offices (O&M portacabin) including welfare facilities, 3 no. spare parts stores (20-40 ft containers), 1 no. backup diesel generator plinth, an underground fire water retention tank, a surface water soakaway, harmonics structure (if required following testing of equipment), all services connections including electrical, potable water and connections to surface water drains, external lighting poles, CCTV, lighting monopole. The proposed Customer HV Compound will comprise Grid Step-up Transformers and associated bunds and fire walls, 5 No. Auxiliary Transformers and associated bunds, associated electrical equipment including current transformers/voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects, external lighting poles, CCTV, lightning monopole. The development proposal also includes a new site access road from the existing Aghada station, access gate, palisade fencing to secure both compounds (2.6m high) and all ancillary site clearance and development works including provision of areas of hard standing, internal access roads, laydown area, car parking and connections to site services and networks. The proposed development is located within the wider ESB Aghada Generating Station complex, which operates under EPA Industrial Emissions Licence Ref. P0561-05 and is a notified Lower Tier COMAH / Seveso establishment. A COMAH Land Use Planning Assessment has been submitted with the application. The proposed BESS development itself is not a COMAH establishment and does not comprise an activity requiring an Industrial Emissions Licence.
Permission for demolition of existing derelict cottage and construction of new two storey dwelling with all associated site development works.
Electricity Supply Board (ESB) intend to apply for planning permission for the development of the "Aghada LDES" (Aghada Long Duration Energy Storage) project comprising a Battery Energy Storage System (BESS) with a capacity of up to 300 MW on 4.65 Ha of lands located in the townland of Ballincarroonig, Aghada, County Cork, within the wider ESB landholding. The proposed development will consist of a fenced compound containing a BESS compound and Customer HV Compound. Specifically, the BESS compound will feature up to 200 No. 20 ft battery energy storage system (BESS) enclosures and up to 20 No. Medium Voltage (MV) Skids / Twin Inverter Skids and associated bunds. Associated ancillary equipment includes 1 no. MV switchgear building consisting of 2 no. adjoining prefabricated buildings, 1 no. Control Building, 5 no. LV Switchgear Containers, a fire water tank and pumphouse, Operation and Maintenance site offices (O&M portacabin) including welfare facilities, 3 no. spare parts stores (20-40 ft containers), 1 no. backup diesel generator plinth, an underground fire water retention tank, a surface water soakaway, harmonics structure (if required following testing of equipment), all services connections including electrical, potable water and connections to surface water drains, external lighting poles, CCTV, lighting monopole. The proposed Customer HV Compound will comprise Grid Step-up Transformers and associated bunds and fire walls, 5 No. Auxiliary Transformers and associated bunds, associated electrical equipment including current transformers/voltage transformers (CT/VT) Circuit Breakers, Neutral Earth Resistors, Cable Chairs, and Line Earth Disconnects, external lighting poles, CCTV, lightning monopole. The development proposal also includes a new site access road from the existing Aghada station, access gate, palisade fencing to secure both compounds (2.6m high) and all ancillary site clearance and development works including provision of areas of hard standing, internal access roads, laydown area, car parking and connections to site services and networks.