Dunmore Ardfield Clonakilty Co. Cork
Proposed development
Proposed elevational and material alterations to existing dwelling including: (a) removal of existing tiled roof and replacement with cement fibre slates, (b) enlargement of existing window opes to south elevation, (c) installation of new window to east elevation, (d) replacement of existing door with window to east elevation, (e) removal of existing chimney stack, (f) installation of external insulation with smooth render finish
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 22 Jul 2025
Timeline
Application received
28 May 2025
Decision due
22 Jul 2025
Decision: conditional
21 Jul 2025
Grant issued
26 Aug 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The demolition of a single-storey dwelling with integrated domestic garage, construction of a replacement dormer dwelling, construction of new wastewater treatment system to replace the existing septic tank and percolation area, carry out minor alterations to the existing site entrance and all associated site works
Construction of a single storey dwelling, the installation of a proprietary treatment unit and to carry out all associated site works
Construct a cattle house with three no. slatted slurry tanks and carry out all associated site works
Extensions, alterations and renovations to an existing dwelling, the conversion of an existing garage into guest studio accommodation, the installation of a waste water treatment system, and percolation area, and all associated site works
Construct two no. slurry storage tanks and carry out all associated site works
Construction of a two storey extension to the existing dwelling modifications to said dwelling, the upgrade of the current foul drainage infrastructure by decommissioning the existing cess pit wastewater treatment system and the installation / construction of a new tertiary wastewater treatment system and all associated site works