Ballymichael Lissarda Co. Cork
Proposed development
Permission for the construction of a new domestic dwelling house, domestic garage, waste water treatment system and percolation area and all associated site works.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 30 Jun 2025
Timeline
Application received
19 Dec 2024
Decision due
30 Jun 2025
Decision: conditional
24 Jun 2025
Grant issued
29 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Permission for raising ground levels with inert soil and stone to improve the agricultural potential of the field. It is proposed to import and recover inert soil and stone under permit and/or as a by-product under article 27. It will include upgrade of existing field entrance, construction of temporary haul roads installation of surface water management measures, site signage and wheel wash for the duration of the works, and all ancillary site works.
Permission for raising ground levels with inert soil and stone to improve the agricultural potential of the field. It is proposed to import and recover inert soil and stone under permit and/or as a by-product under article 27. It will include upgrade of existing field entrance, construction of temporary haul roads, installation of surface water management measures, site signage and wheel wash for the duration of the works, and all ancillary site works
Permission for (a) change of house design from two storey detached dwelling as previously granted (Planning Reg. No.19/5126) to single storey detached dwelling. (b) proprietary waste water treatment system and percolation area; (c) agricultural livestock shed incorporating a slatted underground slurry storage tank and feed storage area (d) ancillary site works.
To construct new single storey agricultural shed with storage/workshop space, site entrance and all associated site works.
Proposed works: 1) demolition of existing external access ramp and external stairs; 2) construction of new two-storey extension to side of existing school to accommodate ASD unit: lower ground floor accommodation to consist of ancillary accommodation room, storage room and SET room; upper ground floor accommodation to consist of 2 no. ASD classrooms with ancillary accommodation and sanitary facilities, para educational room, multi-sensory room and internal staircase and lift; 3) minor alteration to existing elevations and floor plans, to include alterations to the existing main entrance lobby; 4) alteration to front road boundary to include the partial demolition of existing front boundary wall and gated access, and the construction of new boundary wall to be set back from road edge and construction of new pedestrian gated site access; 5) planning permission for retention and relocation on site of existing ancillary storage shed; 6) construction of new external access ramp and stairs; 7) works to upgrade the existing waste water treatment system and percolation area on site and; 8) all ancillary site works.
To construct a dwellinghouse (change of plan from that permitted under Planning Reg No: 19/5126), wastewater treatment system and all associated siteworks.