24/6312Refusedpermission

Berrings Near Berrings Co. Cork

Not open for objections: The council has marked this application invalid or closed.

Proposed development

The development will consist of: The development and operation of a c.13.8MW solar photovoltaic (PV) farm at a 21.25ha site located off the L2760. The application seeks a 10-year permission with an operational lifetime of 35 years and includes: • Approximately 37, 000 solar photovoltaic panels on ground mounted metal frames including string inverters mounted to the rear of the panels, with a maximum table height above ground of approximately 2.7 metres; • 1 no. 38kV substation including 1 no. MV switch room, 1 no. IPP control room, 1 no. ESB switch room and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter fencing; • CCTV; • Construction and operational access provided from the existing site entrance off the L2760; • Internal tracks, site landscaping and all associated site enabling and site development works

Applicant
Not published
Authority
Cork County Council
Decision due
3 Dec 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    5 Dec 2024

  2. Decision due

    3 Dec 2025

  3. Decision: refused

    3 Dec 2025

Loading map…

Site location with nearby applications

Can't object to this one

The council has marked this application invalid or closed.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.