21/4856Grantedpermission

1 Woodland Drive College Wood Ballyellis Mallow, Co. Cork

Not open for objections: The council has already decided this application.

Proposed development

Construction of a single-storey extension to the front, part single-storey/part two-storey extension to the side and alterations to the front porch of existing dwelling house and all associated site works.

Applicant
Not published
Authority
Cork County Council
Decision due
31 May 2021
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    6 Apr 2021

  2. Decision due

    31 May 2021

  3. Decision: conditional

    31 May 2021

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

26/2767Open · 14 days left

Planning permission to (a) demolish a single storey extension to South East Elevation of the existing single storey dwelling house, (b) make minor alterations to the fenestration of the existing North West elevation of the existing single storey dwelling house, (c) construct a new part single storey / part two storey extension to the existing single storey dwelling house and (d) install a new septic tank, percolation area and all associated site works

Ballyellis, Mallow, Co. Cork, P51 H1KN Cork County Council Received 26 Oct 2026
25/6943Granted

The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical turbine paddle; o Construction of a 3 no. cell flocculation stage and mixing process (Note: The provision of the new flash mixing and flocculation tank will require the relocation of existing outdoor chemical bulk storage tanks, the demolition of an existing storage building adjacent the main WTP building and the relocation of existing overhead lines.) • Pipework modifications to the existing rapid gravity filters. • Upgrade of the existing washwater residuals and sludge handling processes to ensure adequate treatment of residuals prior to river discharge and adequate storage for sludge on site, including: o 1no. new below ground equalization tank o 1no. new above ground settlement tank to be installed. o Re-purpose the existing sludge holding tank as a sludge balance tank. o 1no. picket fence thickener. o 1no. new sludge holding tank. o 2 no. pumping station kiosks, including: -sludge pumping station -sludge holding tank feed pumping station • Upgrade of the existing chemical storage arrangements including: o Installation of 1 no. outdoor Fluoride Bulk storage tank with integrated weather shrouded bund o Installation of 2 no. outdoor Poly Aluminium Chloride bulk storage tanks with integrated weather shrouded bunds o Installation of 2 no. outdoor Sodium Hydroxide bulk storage tanks with integrated weather shrouded bunds o Installation of 1no. outdoor Sodium Hypochlorite bulk storage tank. o Installation of 2 no. dedicated chemical delivery apron upon which chemical delivery vehicles shall park while unloading chemicals to the bulk storage tanks. The surface water network for the chemical delivery apron shall be able to be isolated during chemical deliveries and redirected towards a dedicated underground containment tank to capture any chemical spills. o Installation of 1no. indoor Orthophosphate bulk storage tank and bund. (Note, the existing chemical building to be modified including for replacement of 2 no. windows with a single and double door respectively). • Upgrade of the road layout to facilitate the proposed infrastructure upgrade for delivery of chemicals and sludge removal off-site. • Upgrade the surface water management for the proposed works, ensuring that the design complies with the requirements for sustainable drainage system (SuDS). • All ancillary site works including upgrade of the existing electrical, instrumentation, control & automation of the plant, diversion of existing overhead power lines and tree and hedgerow removal.

Mallow Water Treatment Plant, Ballyellis, Mallow, Co. Cork, P51 P489 Cork County Council Received 22 Dec 2025
25/5537Granted

1) Planning permission for the construction of a new 2-storey office/store building, 2) retention permission of the existing modular office building, 3) all associated site works.

Eastly Court Lodge Ballyellis Mallow Co. Cork Cork County Council Received 31 Jul 2025
25/4096Granted

Permission to retain 1) alterations to garage, 2) extensions to rear of garage, 3) canopy to rear of dwelling, and 4) single leaf wall connecting house and garage and all associated site works

Ballyellis Mallow Co. Cork Cork County Council Received 29 Jan 2025
24/6101Granted

Permission for a side extension and a rear extension to an existing dwelling home with all associated site works.

4 Maple Drive Castlepark Mallow Co. Cork Cork County Council Received 6 Nov 2024
24/6013Granted

Permission for a) alterations to fenestration on front elevation, b) construct a new porch to front elevation, c) construct a new single storey extension to rear elevation, all to existing dwelling house, d) decommission existing wastewater treatment system and install a new septic tank and percolation area and all associated site works

Bearforest Upper Mallow Co.Cork Cork County Council Received 24 Oct 2024