Shantraud, Killaloe, Co Clare
Proposed development
For development on lands in the townland of Shantraud, Killaloe, Co. Clare. The total site area to which the application relates is 9,970 sq.m. The proposed development consists of: Construction of a 2 no. storey Discount Foodstore comprising a gross floor area of 2,430sq. m (net retail area 1,569 sq. m (including Off-Licence area of 73 sq. m)), incorporating internal plant room, storage rooms, chiller room, food preparation areas and ancillary office rooms; Provision of roof plant (98 sq. m); Provision of 1 no. new vehicular entrance via Abbey Street at the southern boundary of the site and 1 no. new vehicular entrance via Hill Road at the northern boundary of the site; Provision of 112 no. car parking spaces (including 4 no. accessible spaces, 6 no. parent and child spaces and 2 no. EV spaces) and 16 no. bicycle parking spaces; Provision of roof mounted solar PV panels (975sq. m); Construction of 1 no. ESB substation and switch room (33.71 sq. m); Erection of 2 no. internally illuminated flagpole mounted signs (total area 6.3 sq. m), 3 no. mounted poster display signs on the western façade of the building (total area 8.61 sq. m), 2 no. internally illuminated poster display board signs on the southern and western facades (total area 1.85 sq. m) and 2 no. internally illuminated signs on the southern and western facades (total area 5 sq. m). All ancillary works required including drainage infrastructure, site lighting, site landscaping, site boundary treatments, bin storage, trolley bays, HGV loading bays and all site enabling and development works. A Natura Impact Statement has been prepared in respect of the Proposed Development and will be submitted to the planning authority with this planning application.
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 24 Nov 2026
Timeline
Application received
30 Sept 2026
Last day for public submissions (est.)
Tue 3 Nov 2026
Decision due
24 Nov 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to carry out the following development: The provision of a new housing development consisting 22 No. houses and 34 No. apartments together with all ancillary works including access way which shall be through the existing Shantraud Woods estate
the construction of an extension to existing dwelling house, internal modifications, entrance canopy, elevation changes, modified entrance driveway, boundary wall modification and all associated site works
for the development at Shantraud, Killaloe, Co. Clare consisting of 1. Retention permission and completion of the existing clubhouse, under previous planning ref No. P11-857. 2. Retention permission of the existing retaining wall. 3. Retention permission of the existing changing rooms building. 4. Permission for minor internal and external alterations to the existing clubhouse, including the provision of new signage. 5. Permission for the construction of 2 no. new pedestrian access gates. 6. Permission for the construction of a new hurling wall, ball-stop netting and site fencing. 7. Permission for the construction of a new shed. 8. Permission for the construction of 2 no. new external staircases, one of which will incorporate a step lift. 9. Permission for the construction of an outdoor multi-use games area with lighting. 10. Permission for a services access road to the western portion of the site. 11. Permission for lighting to the car parking areas, together with all associated site development and ancillary works
the development will consist of 1 no. external universal access ramp and an internal timber screen and lobby inside the main door; incorporating a draught lobby, WCs, access ramp and servery. St Flannan's Cathedral is a protected structure RPS no. 153.
for 11 no. residential units, 4 no. semi-detached houses and 7 no. terrace houses, the construction of all associated roads, site entrance, boundary treatments, footpaths, car parking, street lighting and all ancillary site development work
for a residential development of 50 No. dwellings and associated services (all totalling approximately 6,222.12 sqm gross floor space) at a site of approximately 2.12 ha at Harbour Village off the Regional Road R463, in the townland of Knockyclovaun, Killaloe, Co. Clare. The development will consist of the demolition/removal of a redundant storage structure (29 sqm) and the construction of: Type A: 12 No. three storey 3-bedroom semi-detached dwellings (138.5 sqm each) arranged over 6 No. buildings of 285.6 sqm gross floor space each (totalling 1,713.6 sqm gross floor space); Type B: 8 No. two storey 3-bedroom semi-detached dwellings (104.7 sqm each) arranged over 4 No. buildings of 217.6 sqm gross floor space each (totalling 870.4 sqm gross floor space); Type C: 9 No. three storey 4-bedroom detached dwellings (223 sqm gross floor space each) totalling 2,007 sqm gross floor space; Apartment Building A: 9 No. terrace apartment/duplex apartment dwellings (arranged within 1 No. terrace three storey building totalling 712 sqm gross floor space) which incl. 3 No. 1-bedroom apartment units at ground floor (50.7 sqm each), and 6 No. 2-bedroom duplex apartment units over first and second floor (88.1 sqm each); and Apartment Building B: 12 No. terrace apartment / duplex apartment dwellings (arranged within 1 No. terrace three storey building totalling 885 sqm gross floor space) which incl. 6 No. 1-bedroom apartment units at ground floor (51.5 sqm each), and 6 No. 2-bedroom duplex apartment units over first and second floor (79.9 sqm each). The development will further consist of boundary treatments, private and shared private open spaces, hard and soft landscaping, internal roads and pedestrian walkways, public lighting, pedestrian accesses / permeability routes, services (incl. connection to existing underground private foul pumping station and the provision of sustainable urban drainage measures incorporating bioretention swale, wet swales and underground attenuation with associated interceptor and hydro brakes prior to discharge via existing outfall), ESB substation (16.84 sqm gross floor space), 119 No. total car parking spaces (comprising 34 No. dwelling curtilage car parking spaces and the reconfiguration of 59 No. existing spaces to provide a total of 85 No. managed car parking spaces incl. 5 No. disabled / accessible), 3 No. motorcycle parking spaces and 34 No. secure bicycle parking spaces (arranged within 1 No. standalone secured bike storage struc