Creggaun, Ennis, County Clare
Proposed development
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 4 Dec 2026
- Residential units
- 1
- Floor area
- 265.2 m²
Timeline
Application received
13 Aug 2026
Last day for public submissions (est.)
Wed 16 Sept 2026
Decision due
4 Dec 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the development of a dog park with shelter, parking area, modifications to existing entrance, signage and all associated site works to facilitate the proposed development
the development will consist of: 1) The installation of an external heat pump, to the rear of the proposed new school building (Planning Ref: P19/961) 2) The construction of a 2.6 m high acoustically insulated compound enclosure, of approx 45m2. 3) All associated site works
to extend the existing dwelling house to the rear to provide a new kitchen/dining area and to the side to provide an attached Granny Flat & all other associated site and ancillary works
to RETAIN garage as constructed together with all ancillary site development works and services
the development will consist of the demolition of existing boundary walls, demolition of existing single storey six classroom school building of 685sq.m demolition of existing open shed of 25sq.m and demolition of prefabricated classroom building of 207 sq.m. The existing 4no. Classroom block constructed in 2011 with a gross floor area of 370sq.m will be retained and integrated into the new school. The new development consists of new two storey primary school building with a gross floor area of 1720sq.m. New accommodation consists of 8no. new Classrooms, a General Purpose Room and ancillary accommodation. In addition, site works include the replacement of the existing gated entrance with 2no. new gated vehicular and 2 no. new separate pedestrian entrance off the Knockanean Road boundary, serving 24 no. on site car parking spaces and associated set down areas, pedestrian pathways, together with 2 ball courts, play areas, a bin store, a bicycle shelter, gas tank enclosure, 3no. flagpoles, connection to existing foul drainage treatment system, separate surface water drainage, signage, landscaping and all associated site works on an overall site area oof 1.34 hectares. The building will be set back 63.285m from the Knockanean Road
to construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all with associated site works.