Unit 2-3 Kincora Hall, Shannon, Co. Clare
Proposed development
Of (i) change of use from office to retail and (ii) signage and the replacement of window with a door on the east elevation and ancillary site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 4 Jun 2026
Timeline
Application received
10 Apr 2026
Decision due
4 Jun 2026
Decision: conditional
4 Jun 2026
Grant issued
7 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for development at McDonald’s Restaurant, Tullyvarraga, Shannon, Co. Clare, V14 PV48. The development will consist of proposed external and internal modifications/upgrade works including a partial demolition of existing corral/bin store area and associated works with new corral gates, doors, fence panels, larger freezer and chiller stores, and replacement of the internal access door to this reduced corral area, all to allow the provision of a dual ordering system and associated new menu and signage in the drive-thru lane including new height restrictor; upgrade elevational works to external windows, booths and doors; internal layout modifications including to the kitchen, dining area and store and all associated works to facilitate these modifications; new remote bin store area; reconfiguration of car park spaces to 29 no. total spaces to facilitate 2 no. new EV charging stations and 2 no. grill bays and associated relocation of signposts, and new bollards/flexi bollards; lighting; landscaping including surface finishes, line and road markings throughout the car park and site; and all associated site works necessary to facilitate the development
for a change of use of the existing ground-floor community hall to accommodate school-age childcare for children attending primary school, comprising after-school care during term time and holiday childcare/activity camps between 9 a.m. and 5 p.m. during school holidays, for up to 14 weeks annually, with continued community-hall use outside childcare operating hours and use of existing shared ancillary facilities
the development will consist of (a) the construction of 27 no. two-storey dwelling houses, (b) 6 no. two storey dwelling houses, with optional additional attic bedroom accommodation (C) 6 no single storey dwelling houses (Total no. of 39 houses) (d) Pedestrian Connectivity to Bothar an Aerfoirt (R471) (e) all ancillary site works (f) connection to previously applied for roads, paths and services under Planning Ref. P21-372, P21-1397 and P24-60182 A Natura Impact Statement (NIS) has been prepared and accompanies this application
for development which will consist of the demolition of the existing dwelling house and associated outbuildings and the construction of a new respite facility with ancillary support offices, together with all associated site development works
for development which consists of the construction of a stand-alone sports hall building measuring circa 330m², comprising a double height general purpose sports hall and children’s performance space, staff and student sanitary facilities, storage areas, a services plant room, a re-heat kitchen facility, building signage, external public lighting and all associated site works. The planning application is accompanied by a Natura Impact Statement
for change of use from office to a halal deli and retail, signage to east elevation, extractor vent to west elevation and ancillary site works