Smithstown Industrial Estate, Smithstown, Shannon Co. Clare
Proposed development
For development which will consist of the construction of an extension to main building and associated site works
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 1 Sept 2025
Timeline
Application received
2 Apr 2025
Council asked for further information
26 May 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
5 Aug 2025
Decision due
1 Sept 2025
Decision: conditional
1 Sept 2025
Grant issued
7 Oct 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for development at McDonald’s Restaurant, Tullyvarraga, Shannon, Co. Clare, V14 PV48. The development will consist of proposed external and internal modifications/upgrade works including a partial demolition of existing corral/bin store area and associated works with new corral gates, doors, fence panels, larger freezer and chiller stores, and replacement of the internal access door to this reduced corral area, all to allow the provision of a dual ordering system and associated new menu and signage in the drive-thru lane including new height restrictor; upgrade elevational works to external windows, booths and doors; internal layout modifications including to the kitchen, dining area and store and all associated works to facilitate these modifications; new remote bin store area; reconfiguration of car park spaces to 29 no. total spaces to facilitate 2 no. new EV charging stations and 2 no. grill bays and associated relocation of signposts, and new bollards/flexi bollards; lighting; landscaping including surface finishes, line and road markings throughout the car park and site; and all associated site works necessary to facilitate the development
for the Change of use of commercial building granted planning under reference No P21-313 to an Adult Day Services Hub which will comprise of minor Elevational changes and Internal modifications to comprise of 6 Facility rooms, Toilet facilities and Passenger Lift. We also intend to apply for permission for an external garden activity space to rear of Building including all ancillary site works
the development will consist of (a) the construction of 27 no. two-storey dwelling houses, (b) 6 no. two storey dwelling houses, with optional additional attic bedroom accommodation (C) 6 no single storey dwelling houses (Total no. of 39 houses) (d) Pedestrian Connectivity to Bothar an Aerfoirt (R471) (e) all ancillary site works (f) connection to previously applied for roads, paths and services under Planning Ref. P21-372, P21-1397 and P24-60182 A Natura Impact Statement (NIS) has been prepared and accompanies this application
for development which will consist of the construction of a mixed-use commercial building (Warehouse) comprising a gross floor area of 6,095sq.m. with ancillary office accommodation (1,000sq.m.), new access road off Smithstown Road, new site entrance, loading bays, HGV circulation and parking,122 No. on-site parking spaces, boundary fencing, ESB Sub-Station, demolition of existing derelict structures, relocation of existing overhead power lines, and connection to existing utilities together with ancillary site development works
the construction of an extension consisting of new Reception / Visitors Centre, internal alterations, amendments to entrance hard landscaping & car-parking, signage to building, alterations to existing elevations and all associated site works
of a specialist grout rig testing structure comprising a steel frame surface-bolted to a concrete foundation slab, with rendered block work to the lower section, profiled metal cladding to the upper elevations, an openable single-skin roof, roller shutter and personnel access doors, external signage, and all associated site development works