Lynch Park, Shannon, Co. Clare
Proposed development
For the following: a) upgrade existing soccer pitch and training pitch area to all weather astro turf pitches with perimeter fencing and lighting, b) provision of walkway around the perimeter of the pitches along with public lighting, c) all related ancillary works related to the proposed works
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 14 Dec 2026
Timeline
Application received
20 Nov 2025
Last day for public submissions (est.)
Fri 2 Jan 2026
Council asked for further information
22 Jan 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
20 Oct 2026
Decision due
14 Dec 2026
Site location with nearby applications
Can't object to this one
The 5-week submission period has ended.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for development which will consist of the installation of a rooftop solar photovoltaic system on the roofs of Bay 42 and Bay 43 within Block U, 40 47, and the Warehouse and Office Building within the EI Unlimited Company premises. The development will have an approximate capacity of 505 kWp DC and 400 kW AC, comprising approximately 1,010 photovoltaic panels, with an approximate installation area of 9,640.68 square metres, equivalent to approximately 0.964 hectares, together with associated mounting systems, electrical cabling, connection to the existing on site electrical infrastructure, ancillary electrical equipment and all associated site development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
for the change of use of one bedroom apartment on first floor and commercial unit on ground floor to a four bedroom residential dwelling including all ancillary site works
the proposed development will consist of the installation of a rooftop solar photovoltaic system on the roofs of Bay 42 and Bay 43 within Block U, 40-47, and the Warehouse and Office Building within the EI Electronics Unlimited Company premises. The development will have an approximate capacity of 505 kWp DC and 400 kW AC, comprising approximately 1,010 photovoltaic panels, with an approximate installation area of 9,640.68 square metres, equivalent to approximately 0.964 hectares, together with associated mounting systems, electrical cabling, connection to the existing on site electrical infrastructure, ancillary electrical equipment and all associated site development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. Where a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
for development which consists of the construction of a stand-alone sports hall building measuring circa 330m², comprising a double-height general purpose sports hall and children's performance space, staff and student sanitary facilities, storage areas, a services plant room, a re-heat kitchen facility, building signage, external public lighting and all associated site works. The planning application is accompanied by a Natura Impact Statement.
for the proposed development which comprises revisions to previously granted permissions (Planning Ref: P20-575 and P23-224). The development includes the installation of an internal mezzanine first floor (3,172 sqm) within the existing production area, providing additional general manufacturing and cleanroom space, together with ancillary office accommodation and staff welfare facilities. A new atrium is also proposed on the southern elevation to form a dedicated staff entrance. The development also provides for the extension of the existing service yard to accommodate a new sprinkler tank and pump station, in addition to a new three-storey external plant structure to house air handling units, associated plant, and containment enclosures. There is proposed back lit building signage to front and side elevations, alongside alterations to rear elevation. The external yard will include the construction of new single-storey service and storage buildings, along with a separate generator and transformer compound located adjacent to the existing substation. All associated site development works are included, comprising minor revisions to the existing car parking layout, the installation of palladian fencing to the perimeter of the yard with sliding access gates, and the provision of external plant compounds for gas bottle storage
for development which will consist of the 672m2 extension to the existing carpark, principally consisting of an additional 31 car parking spaces, including all associated site works