Monks Well Premises, Main Street Quin, Co. Clare
Proposed development
For (1) Retention permission for the change of use from an existing licensed store to a multi-purpose room associated with the existing bar and restaurant areas, including minor changes to elevations (2) PERMISSION for development which will consist of the following (a) A stretch tent sound absorbent fabric covering, as weather protection between the existing kitchen and toilet areas and the multi-purpose room. (b) Signage associated with the multi-purpose room. (c) A ten-year permission for a temporary car park to serve the existing bar, restaurant and multi-purpose room. (d) Ancillary site works
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 7 May 2026
Timeline
Application received
21 Oct 2025
Council asked for further information
12 Dec 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
31 Mar 2026
Decision due
7 May 2026
Decision: conditional
7 May 2026
Grant issued
9 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the demolition of the existing original dwelling house, excluding the existing extension to the rear which will not be demolished, and the construction of a replacement dwelling and all ancillary works
to demolish the existing damaged dwelling and construct new dwelling along with all associated ancillary works on existing site located
for a change of use of the ground floor level (56.81sqm) from its permitted use as a retail preparation area to use for light manufacturing at Quinn Cross, Quin, Co. Clare, V95 W990. No physical works or structural alterations are proposed. The first floor (36.92sqm) remains in its permitted use
for a Change of Use of the ground floor level (56.81sqm) from its permitted use as a retail preparation area to use for light manufacturing at Quinn Cross, Quin, Co. Clare, V95 W990. No physical works or structural alterations are proposed. The first floor (36.92sqm) remains in its permitted use
the development will consist of the demolition of the existing dwelling under the Defective Concrete Blocks Grant Scheme (DCBGS) and construction of a replacement dwelling, with single-storey extension to the rear and an additional storey added to the side of the dwelling, and all associated site works
to demolish an existing dormer style dwelling constructed with defective concrete blocks, and to construct a replacement storey and a half style dwelling on the original dwelling footprint, with all associated site works