Drumquin, Barefield, Co. Clare
Proposed development
To construct a new dwelling house, site entrance, proprietary waste water treatment system and all associated ancillary site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 15 Sept 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
22 Jul 2025
Decision due
15 Sept 2025
Decision: conditional
12 Sept 2025
Grant issued
4 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the construction of a two storey dwellinghouse, domestic garage & proprietary waste treatment plant, vehicular entrance, including all ancillary site works
to construct a new dwelling house, detached garage, on site waste water treatment system, formation of a new site entrance and all ancillary site works
to construct dwelling house, garage with loft, treatment system and ancillary site works with access via right-of-way to public road
to demolish the existing storey and a half house at this address and to construct in its place a similar storey and a half type dwelling. The application also seeks permission to relocate the existing onsite effluent treatment system, and all other associated and ancillary site works
to construct dwelling house, garage, with loft, treatment system and ancillary site works with access via right-of-way to public road
to carry out, as part of the "Safe Routes to School" scheme, the following development: 1) Construction a 270m footpath on the northwestern side of the R458, opposite the school, and provide 36 no. parallel car parking spaces. 2) Install a controlled pedestrian crossing at the school and 2 no. uncontrolled pedestrian crossings, one to the north and one to the south, all of these will be raised crossings. 3) Remove existing centerline hatching and yellow road edge markings and replace centerline in new location. 4) Install new pencil bollards on existing path, and "School Zone" road markings. 5) Install additional public lighting columns and associated ancillary works to tie into existing public lighting system. 6) Relocation of existing gullies, tapping into existing surface drainage system. 7) Provision of associated Signage and Road Markings 8) All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development