Cahircallamore, Ennis, Co. Clare
Proposed development
Of the garage and shed
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- Not available
- Residential units
- 1
- Floor area
- 368 m²
Timeline
Application received
3 Mar 2025
Council asked for further information
24 Apr 2025
Decision due
Not available
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a first-floor extension to the side of the house
to construct domestic garage/store, plus all ancillary site works
for a Large-Scale Residential Development (LRD) at this site at Ballymacaula, Drumbiggle, Keelty, Circular Road, Ennis, Co. Clare. The development will consist of 1. The construction of 300 no. houses comprising 14 no. 1 beds, 91 no. 2 beds, 164 no. 3 beds, and 31 no. 4 beds; 2. 1 no. creche/childcare facility; 3. The provision of landscaping, open space and amenity areas, including a linear amenity walkway, footpaths, cycleways and play areas; 4. The provision of 3 no. pedestrian connections to the existing public footpath along the N85, 2 no. pedestrian connections into Ballymacaula View Estate, improvements/upgrades to the pedestrian footpaths along Circular Road including a raised pedestrian crossing and pedestrian footpath provision along part of the Drumbiggle and Cahercalla Roads; 5. All associated infrastructure and services including 1 no. vehicular access onto Circular Road, car and bicycle parking, bin storage, lighting, 3 no. ESB substations, drainage,1 no. pumping station, boundary treatments. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development. The application may be inspected online at the following website set up by the applicant: www.ennislrd.ie
to carry out the following development: for Beechpark Machinery Yard building & site upgrade, proposed works to include: 1) Construction of a new 162m2 storage shed located at the rear (north) of the site. 2) Reroofing and recladding of the existing warehouse and office building. 3) Provision of 47 no. car parking spaces, 7 no van parking spaces, 7 no. rigid lorry bays and 3 no. articulated lorry parking bays & 2 no. accessible parking bays. 4) Provision 9 no. EV Charging spaces. 5) Removal of existing boundary fencing and entry gate and provision of new palisade boundary fencing with sliding entry gate. 6) Demarcation of new pedestrian crossing area. 7) Installation of solar panels to southwest facing side of main warehouse and office building roof. 8) Provision of rainwater harvesting system and new surface water attenuation area. 9) Provision of service area for mobile library. 10) All ancillary site works and services. In accordance with the habitats Directive, Appropriate Assessment Screening has been carried out on the project, and the screening report accompanies this application. In accordance with Articles 81 and 120 of the Planning & Development Regulations 2001, (as amended), Clare County Council has concluded from an EIA screening determination that no significant effects on the environment are likely as a result of the proposed development and that an Environmental Impact Assessment is not required
to change layout and design of dwelling house approved under planning permission Ref: P23-612 together with all changes to approved associated site development works and services
for the construction of a single-storey extension to the rear of the existing dwelling, the construction of a new two storey extension to replace the existing single storey volume to the side of the existing dwelling, alterations to the existing front elevation, the removal of existing shed to the rear of the existing dwelling, construction of a new garage to the side of the existing dwelling, external insulation, replacement of existing windows and associated site works