No. 36 Lios Rua, Ballycasey More, Shannon Co Clare
Proposed development
To construct a single storey extension to the side and rear of existing dwelling house, with all associated site works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 23 Dec 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
29 Oct 2025
Decision due
23 Dec 2025
Decision: conditional
15 Dec 2025
Grant issued
26 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the construction of a new exit gateway, new bus set down and associated site works, along the line of the existing boundary, on the south-western side of the existing site
for development which will consist of a car park and associated site works
of a portacabin originally granted under planning reference no. P16/253 and subsequently granted retention permission under planning reference no. P21/631. Retention permission for outdoor disabled access toilet, laundry shed and three number outdoor pods which were required to satisfy the Covid 19 regulations originally granted under planning reference no. P21/631 including ancillary site works
for development which will consist of the construction of a stand-alone sports hall building measuring circa 330m², comprising a double height general purpose sports hall and children's performance space, staff and student sanitary facilities, storage areas, a services plant room, a re-heat kitchen facility, building signage, external public lighting and all associated site works. The planning application is accompanied by a Natura Impact Statement
for the following development: (a) Construction of side extension to existing dwelling house for the purpose of ancillary living accommodation; (b) RETENTION of private garage/ workshop to rear of dwelling house; (c) All associated site works and services
for proposed development which will consist of the construction of a light industrial manufacturing facility with ancillary office space measuring circa 3,630m² comprising, A. a naturally lit high-bay workspace and a two-storey annex comprising administration and office spaces, sanitary and staff welfare facilities, B. The provision of external public lighting, a standalone ESB substation and switch room building, an enclosed external building services enclosure and an enclosed waste storage compound, C. Two new site entrances from the perimeter public roadways; a HGV entrance from the north off Smithstown Road to a dedicated goods yard and a second entrance from the east for all other vehicles, D. Parking for 76 cars, of which 17 are EV Charging spaces and 4 are Universal Access spaces, 38 bicycles under a covered shelter and a vehicular set-down zone, E. New ground level corporate signage to be placed at the south-west side of the adjacent roundabout on the Smithstown Road, F. Roof and ground mounted photovoltaic panels, building signage, ancillary soft and hard landscaping and all associated site works and services. The planning application is accompanied by a Natura Impact Statement