Moys, Killaloe, Co. Clare
Proposed development
To develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 28 May 2025
Timeline
Application received
5 Dec 2024
Council asked for further information
5 Feb 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
22 Mar 2025
Decision due
28 May 2025
Decision: conditional
27 May 2025
Grant issued
1 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to carry out the following development: The provision of a new housing development consisting 22 No. houses and 34 No. apartments together with all ancillary works including access way which shall be through the existing Shantraud Woods estate
(i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings
1. (i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings
for Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor - Retention of 2nr. existing containerised refrigeration units to the south-west of unit 2 - New first floor windows to north elevation of Production/Administration Building - All associated ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application
to develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application