2460603Under appealpermission

Ballyquin More and Woodpark, Ballyquin, Co. Clare

Not open for objections: The council has already decided this application.

Proposed development

For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.

Applicant
Not published
Authority
Clare County Council
Decision due
1 Sept 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    29 Nov 2024

  2. Council asked for further information

    31 Jan 2025

  3. Further information received. If the council treats it as significant, a new submission period opens (check the council's file)

    24 Jun 2025

  4. Decision due

    1 Sept 2025

  5. Decision: refused

    1 Sept 2025

  6. Appeal lodged (ACP-323758-25)

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2560794Under appeal

the proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be

Within the townlands of Woodpark TD and Leitrim TD, near Bridgetown, Co. Clare Clare County Council Received 12 Dec 2025
24385Withdrawn

to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, utilising existing site entrance, including all ancillary site works

Ballyquin More Td, O'Briensbridge, Co Clare Clare County Council Received 18 Nov 2024
21182Granted

the development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works

Leitrim, O'Briensbridge, Co Clare Clare County Council Received 1 Mar 2021
18182Granted

to construct a Slatted Shed, Cattle Crush and associated site works

Fahymore, Bridgetown, Co. Clare Clare County Council Received 12 Mar 2018
17552Granted

for development which will consist of the importation of inert excavation spoil comprising natural materials of clay, silt, sand, gravel or stone for the purpose of restoration of a previously extracted area ( 1.08ha) within Ballyquin Pit. The application is accompanied by Environmental Impact Statement ( Environmental Impact Assessment Report)

Ballyquin Pit, O'Briensbridge, Co. Clare Clare County Council Received 19 Jul 2017