Building 2 East Park Shannon Industrial Estate, Shannon, Co. Clare
Proposed development
For works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon, Co. Clare. The proposed development consists of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 29 May 2025
Timeline
Application received
8 Nov 2024
Council asked for further information
17 Dec 2024
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
22 Apr 2025
Decision due
29 May 2025
Decision: conditional
26 May 2025
Grant issued
1 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the development at this site at the Townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline, and Ballycasey Beg, Co. Clare. The proposed development will consist of an amendment to a previously consented development (Planning Reference 25/260 by Clare County Council) comprising of; (i) the relocation of the permitted IPP substation, (ii) revised 110 kV grid connection infrastructure including the provision of two 110 kV lattice towers, underground cable ducting and associated infrastructure, (iii) amendments to the electrical interface connection arrangement, (iv) the provision of palisade fencing and associated ancillary infrastructure, (v) a minor extension to the permitted development boundary to the west of the site to facilitate the proposed 110 kV lattice tower and associated underground cable infrastructure, and (vi) all associated ancillary works required to facilitate connection to Drumline 110 kV Substation, Co. Clare. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the planning authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee, €20, within the period of— a) 5 weeks, or b) 2 weeks, in the case of a planning application for small-scale solar energy equipment development or development that is the installation of a small-scale non-ground source heat pump. beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions or may refuse to grant permission. For this application the submission period is 5 weeks beginning on the date of receipt by the authority of the application.
for the Change of use of commercial building granted planning under reference No P21-313 to an Adult Day Services Hub which will comprise of minor Elevational changes and Internal modifications to comprise of 6 Facility rooms, Toilet facilities and Passenger Lift. We also intend to apply for permission for an external garden activity space to rear of Building including all ancillary site works
for the proposed development which consists of the provision of corporate back-lit signage in the form of a new advertisement structure at ground level to be placed at the north-east side of the roundabout on the Smithstown Road and at the entrance to Shannon Airport Business Park – East. The signage proposal is intended to replicate signage proposals submitted under Clare County Council planning application reference P25-60656 at the opposite side of the roundabout
for development which will consist of the construction of a mixed-use commercial building (Warehouse) comprising a gross floor area of 6,095sq.m. with ancillary office accommodation (1,000sq.m.), new access road off Smithstown Road, new site entrance, loading bays, HGV circulation and parking,122 No. on-site parking spaces, boundary fencing, ESB Sub-Station, demolition of existing derelict structures, relocation of existing overhead power lines, and connection to existing utilities together with ancillary site development works
the construction of an extension consisting of new Reception / Visitors Centre, internal alterations, amendments to entrance hard landscaping & car-parking, signage to building, alterations to existing elevations and all associated site works
of a specialist grout rig testing structure comprising a steel frame surface-bolted to a concrete foundation slab, with rendered block work to the lower section, profiled metal cladding to the upper elevations, an openable single-skin roof, roller shutter and personnel access doors, external signage, and all associated site development works