Ballykeelaun, Parteen, Co Clare
Proposed development
For development, the development consists of the construction of an underslat tank, dairy store and associated site works
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 24 Nov 2021
Timeline
Application received
13 Aug 2021
Council asked for further information
6 Oct 2021
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
28 Oct 2021
Decision due
24 Nov 2021
Decision: conditional
23 Nov 2021
Grant issued
6 Jan 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the construction of extension to the front of existing dwelling house together with associated site works
the development will consist of the construction of 21 residential units consisting of (i) 15 no. two storey 3 bed semi-detached units (ii) 4 no. three storey 4 bed semi-detached units (iii) 2 no. 2 bed apartments (iv) Boundary walls and landscaping (v) an upgraded pump station (vi) an access roadway from Firhill and all ancillary site works
for a new single storey dwelling house, new domestic garage, new site entrance adjacent to the existing site entrance to serve the existing neighbouring dwelling at Kincora House and all ancillary site works above and below ground
for development which will consist of planning permission for a period of 10 years to construct and complete a Solar Energy development with a total site area of 36.70 hectares, to include the construction of PV panels mounted on metal frames, a substation, inverter substations, internal access tracks (new and upgraded), underground cabling, security fencing with CCTV cameras and access gates, a temporary construction compound and all ancillary grid infrastructure and associated works. The Solar Farm would be operational for 40 years. The proposed grid route will connect the substation at the application site to the existing grid infrastructure at Ardnacrusha Power Station via a 38kV underground cable which is 1.2km in length (320m of which is on the local road L3056). A Natura Impact Statement (NIS) will be submitted with this application
to RETAIN a ground floor extension with alterations to existing house and for planning PERMISSION to construct a detached garage building with new entrance, for insertion of dormer windows and alterations to existing attic space, and a yoga studio extension to first floor flat roof to existing house, solar panels and all associated site development works
for the following: 1. Demolish existing shed to facilitate a rear extension to the existing dwelling. 2. Widen the existing vehicular entrance. 3. Elevational changes to the house. 4. All ancillary site works