Dromoland, Latoon South, Co. Clare
Proposed development
For the construction of a 30 metre telecommunications structure, carrying antennae and dishes within a 2.4 metre high palisade compound at the M18 Junction 11, Dromoland, Latoon South, Co. Clare
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 17 Jun 2018
Timeline
Application received
11 Jan 2018
Council asked for further information
6 Mar 2018
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
2 May 2018
Decision due
17 Jun 2018
Decision: refused
15 Jun 2018
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
to construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
to construct a dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
to carry out the following development: 1) The construction of a new 4m wide cycling infrastructure approximately 1185 metres in length, travelling from north to south on the R458, commencing with an uncontrolled crossing point north of the river Rine, then veering off-road over a refurbished masonry arch bridge, under the M18 Bridge and over the OPW embankment. The cycle path will then travel south via the existing access road serving the motorway attenuation ponds to where it will cross the L3148 east of the Dromoland East Roundabout via an uncontrolled crossing. It then veers south off-road, tying back in with the existing cycling infrastructure on the R458 with an uncontrolled crossing located approximately 300m south of the Dromoland East Roundabout. 2) An extension of the existing 60Kph speed limit for consideration of the scheme. 3) Installation of public lighting 4) The installation of associated signage. 5) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. The masonry bridge is a Protected Structure RPS No.:211 NIAH 20404204 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4
for development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works