Lismeen, Ballyjamesduff, Co. Cavan
Proposed development
For (1) RETENTION permission is sought for: (a) to retain revised site boundaries, (b) to retain the relocation of fuel storage tanks, surrounded by a bunded tank, (c) to retain the installation of a petrol/oil interceptor, silt trap and associated drainage. (2) Planning PERMISSION is sought to (a) construct a single storey 3 bay vehicle storage shed and all associated works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- Not available
Timeline
Application received
11 May 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for (1) the demolition of the existing single storey mono pitched roof entrance (2) the construction of a new flat roof front extension to the existing building, to provide for a new entrance and office (3) new external pedestrian door within the side elevation of the existing building (4) external signage (5) the existing vehicular entrance off the public road will be modified, and (6) all necessary ancillary site development works to facilitate this development
for (1) Retention permission is sought for: (a) to retain revised site boundaries, (b) to retain the relocation of fuel storage tanks, surrounded by a bunded tank, (c) to retain the installation of a petrol/oil interceptor, silt trap and associated drainage. (2) Planning permission is sought to (a) construct a single storey 3 bay vehicle storage shed and all associated works
for construction of a storey and half dwelling, detached domestic garage, effluent treatment system, percolation area and all ancillary site works
for construction of a storey and half dwelling, detached domestic garage, effluent treatment system, percolation area and all ancillary site works
for development consisting of: Installation and operation of a solar farm with an export capacity of approximately 8mw to include photovoltaic panels array with mounted steel frames on screw pile foundations, within an overall site area of 16.67ha, 10 no. Inverter station, substation, communications building, pole mounted security cameras, ducting & underground electrical cabling, boundary fencing and site entrance, together with all associated site works and services. The proposed lifetime of the project is 25 years. A Glare Assessment Report will be submitted to the planning authority with the application
to erect a single storey extension to side of existing dwelling, and detached domestic garage and all ancillary site works