Loreto College, Drumkeen, Cavan
Proposed development
For the installation of a single biomass boiler enclosure and new 2000 litre LPG tank located to the rear of the site
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- Not available
Timeline
Application received
9 Apr 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for an amendment to a previously approved Large-scale Residential development Pl. Ref. 2460067 and An Bord Pleanala Ref ABP-319750-24 on lands at Drumlark Townland, Cavan Town. Particulars of the development comprise as follows: Change of unit type of 25 no. Duplex Apartments in Blocks A, B, C, D, E, and F. (1) ‘Block A’ Change of 2 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at ground floor, (2) ‘Block B’ Change of 4 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at ground floor, (3) ‘Block C’ Change of 4 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at ground floor, (4) ‘Block D’ Change of 4 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at first/second floor, (5) ‘Block E’ Change of 4 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at first/second floor, (6) ‘Block F’ Change of 3 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at first/second floor, (7) ‘Block G’ Change of 4 no. 1-bedroom / 2-person units to 2-bedroom / 4-person units at first/second floor
for erecting ground mounted photovoltaic solar panels and all associated site works
for the installation of a single biomass boiler enclosure and new 2,000 litre LPG tank located to the rear of the site at, This site contains one protected structure Reg No: 40402021
for the installation of a single biomass boiler enclosure and new 2000 litre LPG tank located to the rear of the site
to construct a new single-storey extension to the side of existing dwelling house, together with all associated site development works
for a Large-scale Residential development consisting of the provision of a total of 145no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The reprofiling of ground levels within the site and associated site works as required. (c) The provision of a total of 91no. residential dwellings which will consist of 25no. 2 bed units, 55no. 3 bed units and 11no. 4 bed units. The dwellings range in height from single storey to two storey. (d) The provision of a total of 54no. duplex apartment units consisting of 15no.1 bed units and 39no. 2bed units. The duplex apartment blocks range in height from two storey to three storey in height. (e) Provision of a 2 storey creche with associated parking, bicycle and bin storage. (f) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (g) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (h) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (i) Creation of a new access point from the public road with associated works to include for a connections to the existing public footpath along with provision of a pedestrian crossing point with a raised table. (i) The provision of a new shared cycleway and footpath to serve the site. (j) Provision of internal access roads and footpaths and associated works to include for retaining walls and regrading of site levels as required. (k) Provision of residential communal open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (l) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (m) Installation of culverts and headwalls to facilitate crossing over the existing watercourse aligning the site boundary with associated works. (n) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water and ESB networks. A Natura Impact Statem