Kilconny, Belturbet, Co.Cavan
Proposed development
For conversion of an existing outbuilding to a one-storey, one-bedroom dwelling. Works will include the removal of the existing flat roof and construction of a new pitched roof, upgrade of existing elevations, connection to public mains, and all associated works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 11 Jun 2026
- Residential units
- 1
- Floor area
- 53.8 m²
Timeline
Application received
18 Dec 2025
Council asked for further information
20 Feb 2026
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
15 May 2026
Decision due
11 Jun 2026
Decision: conditional
9 Jun 2026
Grant issued
16 Jul 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for demolition of existing storage shed, erection of two storey split level residential building comprising 2no. 2 bed units, bin store, carparking, new site entrance, connection to public services and all ancillary site works
for a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works to include for demolition of existing buildings. (b) The provision of a total of 12no. 2bed duplex apartment units in a single building. (c) Provision of associated car parking at surface level with provision of a new vehicular entrance to the proposed courtyard. (d) Provision of bin storage facilities, private amenity terraces and balconies. (e) Provision of internal access roads and footpaths and associated works to include for regrading of site levels and boundary treatments. (f) Provision of communal space area along with all hard and soft landscape works with public lighting, planting and boundary treatments. (g) Internal site works and attenuation systems which will include for provision of hydrocarbon and silt interceptors prior to discharge. (h) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water connections and ESB network connection
for EXTENSION OF DURATION OF REF 20602 to 1)partially demolish and convert existing community centre (formerly Erne Ballroom / Palais and protected structure) to 2 no. one-bedroom apartments retaining the front façade of existing building, 2) erect 3 no. two-storey two-bedroom terraced houses, 3) erect 2 no. two-bedroom terraced bungalows (7 units in total) with connection to all public services and all associated site works. These works are to be carried out to protected structure CV44018 Erne Ballroom. Significant further information and revised plans have been submitted
to extend existing single storey extension and raise to two-storey to existing two-storey dwelling, associated site works and connect to existing services
to construct bungalow, create new bellmouth entrance, site development works and connect to existing services
for demolition of existing storage shed, erection of 2no. two Storey detached dwellings, new site entrance, carparking, connection to public services and all ancillary site works