Circle K Cavan Service Station, Dublin Road, Cavan
Proposed development
For the removal of existing car wash sump and jet wash unit and the construction of an electric vehicle charging hub and associated infrastructure consisting of the following: (i) installation of 4no. electric vehicle charging bays and 2no. charging units, (ii) new modular sub-unit and CT metering cabinet with mini pillar, (iii) EV banner signage. The proposed development also comprises of new services area along southern boundary and the installation of above ground 4,750 litre Adblue tank along eastern boundary and all other associated site development and surface water drainage works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 19 Nov 2025
Timeline
Application received
17 Apr 2025
Council asked for further information
9 Jun 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
23 Oct 2025
Decision due
19 Nov 2025
Decision: conditional
18 Nov 2025
Grant issued
31 Dec 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for proposed external and internal modifications/upgrade works including demolition of existing sliding entrance door on the east elevation and its relocation to the north elevation; demolition of existing window glazing and stall riser on the north elevation with new window glazing and stall riser and high level window to the east elevation; replacement of glazing with new walls on the west elevation; internal layout modifications including to the kitchen and dining area and all associated works to facilitate these modifications; landscaping including works to the external patio area and relocation of outdoor furniture/seating area; relined car park and new road markings; and all associated site works necessary to facilitate the development - SIGNIFICANT FURTHER HAS BEEN RECEIVED
for proposed external and internal modifications/upgrade works including relocation of the sliding entrance door and glazing from the east elevation to the north elevation, with new window glazing and stall riser and high level window to the east elevation; replacement of glazing with new walls on the west elevation; internal layout modifications including to the kitchen and dining area and all associated works to facilitate these modifications; landscaping including works to the external patio area and relocation of outdoor furniture/seating area; relined car park and new road markings; and all associated site works
for change of use of the existing boiler house ‘Block K’ to a specialist training facility, incorporating general purpose classrooms, technology & engineering rooms, motor workshop, ancillary support spaces and all associated site works at the CMETB FET Campus on the Dublin Road, Cavan. Co. Cavan. Proposed works include; i) Repurposing and reconfiguring of existing boiler house to specialist training facility ii) Revised openings and elevational changes iii) Internal & External demolition works iv) provision of new first and second floors v) new passenger lift and stairs vi) covered outdoor construction space vii) All associated site works
for the change of use of the existing boiler house ‘Block K’ to a specialist training facility, incorporating general purpose classrooms, technology & engineering rooms, motor workshop, ancillary support spaces and all associated site works at the CMETB FET Campus
for Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (c. 1.929 Ha) located at Cavan Business & Technology Park, Dublin Road, Killygarry, Cavan, Co. Cavan. The site is generally bound to the north by a private site access road; to the east by the Cavan Business & Technology Park private access road; to the south by unoccupied greenfield land; and to the west by an existing industrial property. The proposed development will consist of the provision of a new 38 kV / MV Gas Insulated Switchgear (GIS) Electrical Substation and will include the following elements: 1. Removal of existing MV timber poleset and associated overhead line 2. Construction of: i. A new substation compound (c. 1,999 sq.m) with a 2.6 m high palisade fence ii. 1 No. prefabricated 38 kV GIS module and foundation (c.31 m2 and c.5.139 m high); iii. 1 No. prefabricated MV GIS module and foundation (c.34 m2 and c.4.64 m high); iv. 1 No. prefabricated Control Room module and foundation (c.34 m2 and c.4.64 m high); v. 2 No. 38/20 kV 18.75 MVA transformers and associated bunds (c.4.67 m high ea.); vi. Telecommunication SCADA pole of c. 12 m in height; vii. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; viii. All associated site development works including provision of access roads, lighting, boundary fences, landscaping, site services including drainage and all ancillary site development works
for amendments to the previously approved planning application (Reference 21/405) to include the following: 1) Increase in floor area of the proposed development, which includes minor alterations to the footprint of the extension. 2) Associated elevational changes to the extension. 3) Adjustment to the site layout plan to include a new vehicular entrance for the proposed extension from the existing IDA Business and Technology park service road, including street lighting, boundary treatments, and footpath connectivity, along with alterations to carparking layout. 4) Construction of a new standalone bin-store and bicycle storage building. 5) PV panels to be constructed on the roof of the extension. 6) All associated ancillary site development works