Unit 1 Kilmore Business Park, Dublin Road Cavan, Co. Cavan
Proposed development
For the change of use of the unit from light industrial to warehouse with trade counters for the sale of building related products principally to trade. Proposed external works on the south east elevation include a new access door and side glazing panels and operator sign with external downlighting. North east elevation: new double exit doors and a vinyl seasonal sign. North West elevation: mechanical plant and air handling units. Internally: the erection of trade counters and staff facilities. All other ancillary works associated with the proposed development
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 6 Apr 2025
Timeline
Application received
10 Feb 2025
Decision due
6 Apr 2025
Decision: conditional
4 Apr 2025
Grant issued
15 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for proposed external and internal modifications/upgrade works including demolition of existing sliding entrance door on the east elevation and its relocation to the north elevation; demolition of existing window glazing and stall riser on the north elevation with new window glazing and stall riser and high level window to the east elevation; replacement of glazing with new walls on the west elevation; internal layout modifications including to the kitchen and dining area and all associated works to facilitate these modifications; landscaping including works to the external patio area and relocation of outdoor furniture/seating area; relined car park and new road markings; and all associated site works necessary to facilitate the development - SIGNIFICANT FURTHER HAS BEEN RECEIVED
for proposed external and internal modifications/upgrade works including relocation of the sliding entrance door and glazing from the east elevation to the north elevation, with new window glazing and stall riser and high level window to the east elevation; replacement of glazing with new walls on the west elevation; internal layout modifications including to the kitchen and dining area and all associated works to facilitate these modifications; landscaping including works to the external patio area and relocation of outdoor furniture/seating area; relined car park and new road markings; and all associated site works
for change of use of the existing boiler house ‘Block K’ to a specialist training facility, incorporating general purpose classrooms, technology & engineering rooms, motor workshop, ancillary support spaces and all associated site works at the CMETB FET Campus on the Dublin Road, Cavan. Co. Cavan. Proposed works include; i) Repurposing and reconfiguring of existing boiler house to specialist training facility ii) Revised openings and elevational changes iii) Internal & External demolition works iv) provision of new first and second floors v) new passenger lift and stairs vi) covered outdoor construction space vii) All associated site works
for the change of use of the existing boiler house ‘Block K’ to a specialist training facility, incorporating general purpose classrooms, technology & engineering rooms, motor workshop, ancillary support spaces and all associated site works at the CMETB FET Campus
for Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (c. 1.929 Ha) located at Cavan Business & Technology Park, Dublin Road, Killygarry, Cavan, Co. Cavan. The site is generally bound to the north by a private site access road; to the east by the Cavan Business & Technology Park private access road; to the south by unoccupied greenfield land; and to the west by an existing industrial property. The proposed development will consist of the provision of a new 38 kV / MV Gas Insulated Switchgear (GIS) Electrical Substation and will include the following elements: 1. Removal of existing MV timber poleset and associated overhead line 2. Construction of: i. A new substation compound (c. 1,999 sq.m) with a 2.6 m high palisade fence ii. 1 No. prefabricated 38 kV GIS module and foundation (c.31 m2 and c.5.139 m high); iii. 1 No. prefabricated MV GIS module and foundation (c.34 m2 and c.4.64 m high); iv. 1 No. prefabricated Control Room module and foundation (c.34 m2 and c.4.64 m high); v. 2 No. 38/20 kV 18.75 MVA transformers and associated bunds (c.4.67 m high ea.); vi. Telecommunication SCADA pole of c. 12 m in height; vii. Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; viii. All associated site development works including provision of access roads, lighting, boundary fences, landscaping, site services including drainage and all ancillary site development works
for amendments to the previously approved planning application (Reference 21/405) to include the following: 1) Increase in floor area of the proposed development, which includes minor alterations to the footprint of the extension. 2) Associated elevational changes to the extension. 3) Adjustment to the site layout plan to include a new vehicular entrance for the proposed extension from the existing IDA Business and Technology park service road, including street lighting, boundary treatments, and footpath connectivity, along with alterations to carparking layout. 4) Construction of a new standalone bin-store and bicycle storage building. 5) PV panels to be constructed on the roof of the extension. 6) All associated ancillary site development works