The Olde Post Inn, Knockateery Cloverhill, Belturbet
Proposed development
To construct new wastewater treatment system and percolation area, to decomission existing wastewater treatment system and carry out associated site and ancillary works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- Not available
Timeline
Application received
18 Sept 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for an additional new extension to the previously granted development (planning reference number 23267 - currently under construction), alterations to site layout / yard area, revise site boundaries and all ancillary site development works
for the construction of single storey extension with a basement to the side of existing dwelling with external lift, garden room & terrace area at ground floor level (basement level to contain swimming pool, gym & associated areas) and all ancillary site works
to carry out the following alterations & works to an existing dwelling house. (1) To demolish single storey section to side & rear of dwelling house; together with detached domestic garage to side of property, and disused outbuilding to the rear of the property. (2) To construct a new part single storey & part two-storey extension to side & rear of existing dwelling house building. (3) To make some minor alterations to the front elevation of the dwelling house, and (4) To upgrade existing septic tank system to a new approved proprietary wastewater treatment system & percolation area, together with all associated site development works
to 1. demolish existing single storey toilet block and canteen. 2. demolish existing assembly shed 3. demolish existing steel cutting building and associated parts 4. construct extension to existing workshop building to accomodate - steel cutting and fabrication. 5. construct extension to existing workshop building to accomodate paint shed. 6. construct new ESB sub station and associated works 7. re-arrange existing yard area. 8. Provide screening and landscaping. 9. And carry out associated site works. 10. to RETAIN fabrication and assembly building
for development consisting of the replacement of an existing 10m high support pole carrying associated antennae for a 24 metre high free standing communications structure with its associated antennae, communication dish, ground equipment and all associated site development works. The development will continue to form part of existing 3G and 4G Broadband Network. Significant further information and revised plans have been submitted.
to construct new waste water treatment system and percolation area, to decommission existing waste water treatment system and carry out associated site and ancillary works at The Old Post Inn (which is a Protected Structure)