Kilnacrott Td., Ballyjamesduff, Co. Cavan
Proposed development
For revisions to a previously granted education / retreat centre (Pl. Ref. 23/60014) as follows: 1) revisions to the administration building including a 142 SqM increase in floor area (now 1,400 SqM), to accommodate additional ancillary plant areas on the ground floor, a new first floor plant level, increased roof heights, revised roof overhangs and all associated internal and elevational changes, 2) an ESB substation / switch room building (32 SqM) and all associated external works
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 22 Apr 2025
Timeline
Application received
20 Dec 2024
Council asked for further information
17 Feb 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
26 Mar 2025
Decision due
22 Apr 2025
Decision: conditional
11 Apr 2025
Grant issued
23 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for 1 no fully serviced, bungalow style dwelling, new sewage treatment system & percolation area, private well, new entrance walls and piers and all associated ancillary site works
to construct 1 No. Poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and all associated site works (to include new/upgraded site entrance). SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.
to construct 1 No. Poultry house together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and all associated site works (to include new/upgraded site entrance) arising from the above proposed development. A Natura Impact Statement (N.I.S.) will be submitted with this planning application, significant further information has been received
for development consisting of: A ten year permission for 1) the demolition of the Kilnacrott Abbey buildings and for the construction of an education / retreat centre comprising, 2) a caretakers lodge (residency) of 124 SqM, 3) 4 No. 3 bedroom dwelling units of 120 SqM each, 4) 4 No. multi-occupancy (8 bedroom) dormitories of 367 SqM each, 5) an administration building of 1,258 SqM with dining areas, offices, studios, crèche, ancillary toilet and stores, 6) a conference and education centre of 1,163 SqM, 7) an oratory of 180 SqM, 8) a maintenance building of 144 SqM and 9) an effluent treatment system to replace the old septic tank system, ancillary parking, sports facilities (astro pitches) and associated external works. The application is accompanied by a Natura Impact Statement (NIS)
for a ten year permission for 1) the demolition of the Kilnacrott Abbey buildings and for the reconstruction of an education/retreat centre comprising, 2) a caretakers lodge (residency) of 124SqM, 3) 4 No. 3 bedroom dwelling units of 120 SqM each, 4) 4 No. multi-occupancy (8 bedroom) dormitories of 367 SqM each, 5) an administration building of 1,258 SqM with dining area, offices, studios, creche, ancillary toilet and stores, 6) a conference and education centre of 1,163 SqM, 7) an oratory of 180 SqM, 8) a maintenance building of 144 SqM and 9) an effluent treatment system to replace old septic tank system, ancillary parking, sports facilities (astro pitches) and associated external works. The application is accompanies by a Natura Impact Statement (NIS)
to extend to the rear of the existing fully serviced dormer style dwelling house - to extend the existing ground floor kitchen & utility area and on first floor extend the master bedroom with a new en suite, dressing area & balcony to the rear elevation. Extension over the kitchen area is part two storey in style with adjoining first floor balcony. The utility area is single storey in style with roof design connecting to new canopy across the rear of the remaining existing house. Allow alterations to fenestration to some some of the elevations & roof and demolition of internal walls to allow new design. Existing waste water treatment unit and percolation area in place and maintain water connection and all ancillary site works