Billis, New Inns, Ballyjamesduff Co. Cavan
Proposed development
To consist of the renovation and extension of an existing dwelling including internal and external alterations, new domestic garage, upgrade existing waste water treatment system with a new advanced waste water treatment system and percolation area, and all ancillary site development works
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Cavan County Council
- Decision due
- 21 Mar 2024
- Residential units
- 1
- Floor area
- 133.51 m²
Timeline
Application received
26 Jan 2024
Decision due
21 Mar 2024
Decision: conditional
15 Mar 2024
Grant issued
25 Apr 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to construct a single storey extension to side and rear of existing dwelling, together with all associated site works
to (a) retain partially built side/rear single storey extension, (b) PERMISSION for proposed completion of side/rear single storey extension and proposed side/rear two storey extension, associated internal alterations and alter windows & door openings, external alterations; entire refurbishment of property curtilage; replacement of old septic tank with wastewater treatment system with associated site development works; sundry works to existing dwelling - treatment of rising damp, dry rot and woodworm; replacement of timber flooring; upgrade thermal insulation throughout with repair/replacement to plasterwork; windows repaired
install new proprietary waste water treatment system and percolation area along with associated site works
to (a) relocate existing vehicular entrance (b) form access drive (c) form new hard surfaced car park (d) create new amenity garden (e) replace existing parking area with an enclosed multi use games area and outdoor play equipment (f) construct single storey extensions to existing community hall (g) all lighting and drainage associated. Significant further information and revised plans have been submitted
to erect new bungalow dwelling, install sewerage treatment system, entrance works and all ancillary site works
to erect outdoor playschool with 2 no. gazebos to incorporate meet and greet areas, play areas, dining area, toilets, and upgrade existing treatment system and percolation area and extend opening hours to 6pm, and all associated works at existing childcare facility